Tower Crane TC7034 Max. lifting Weight 12T
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC7034 Description
Feature: Tower Crane
Condition: New
Application: Construction
Max.Lifting Load: 12T
Max Tip Load:3.4T
Independent Height:50M
Max Lifting Height: 200M
Span: 70m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TC7034
Packaging & Delivery of Tower Crane TC7034
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Feature of Tower Crane TC7034
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC7034 Specifiction
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: where can i find the xxx video of bob crane?
- Bob Crane Tapes
- Q: Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
- 1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.
- Q: the lifting capacity of a hydraulic crane is based on two primary design factors what are they?
- Stability(when it tips) and mechanical structure (when it breaks). Bomba is right: when it comes to a simple hydraulic cylinder. The complete crane is a more complex beast than that though.
- Q: when high rise buildings are built a crane is erected to lift iron and cement up. How do they erect these cranes?
- this is not the answer i expected
- Q: It's got to be the most famous of all designs in the art.
- Yes okorder
- Q: When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
- Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
- Q: My science teacher wants to know why cranes make work easier rather than just lifting an object yourself. She refers to the formula of force x distance. So i have to compare (in a way) the work of a human lifting an object and a crane lifting an object. Grrrr.... I hate this project!
- The type of crane she is referring to ia a simple pole with a fulcrum placed between the person operating the crane, and the mass to be lifted. Imagine a weightless pole with a rope tied to one end attached to a mass of weight 224 lbs The pole is 9 feet long Let's say the human weighs 112 lbs, or half of what is to be lifted. Without a crane, it will be difficult to lift that much and swing it around. With the crane, though, let's look at the advantage when a fulcrum is placed under the pole and the person pushes down on the pole to lift the weight. First, note that gravity is in favor of the person to use their weight on the pole. Using physics, with the fulcrum place at x from the mass to be lifted, the downward force of the person is F*(9-x)=224*x or F=224*x/(9-x) now plug in some values for x and compute the force: x F 4.5 224 3.5 143 2.5 86 1.5 45 0.5 13 I started by placing the fulcrum exactly in the middle and then moving the fulcrum in increments of 1 foot closer to the weight to be lifted Notice that the more pole towards the person pressing down, the less force the person has to apply to lift the weight. Also, note that when the fulcrum is in the middle, the person must apply a downward force equal to the weight - which willl be difficult foir a person that weighs 112lbs. However, once the fulcrum is placed 2.5 ft from the weight, the person only need apply 86 lbs of downward pressure. Leverage. j
- Q: Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
- I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
- Q: i really need help
- Influenced by Darwin’s Theory of Evolution, Crane believed that people’s actions were determined by environmental factors rather than by conscious choices on their part. He believed also that conflict was the crucible in which human development occurred, and thus was attracted to the violent and seamy aspects of human experience.
- Q: Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
- Yes, a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
Send your message to us
Tower Crane TC7034 Max. lifting Weight 12T
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords