Tower Crane TC7034 Construction Equipmen Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7034 Description:
1.CMAX Tower Crane TC7034 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7034 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7034 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7034 Parameter:
Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 3.4
Tower Crane TC7034 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7034 Diagram:
Tower Crane TC7034 Technical Sheet:
Tower Crane TC7034 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
- Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
- Q: who can tell me tower crane details?
- 1. Accurate positioning Kinematic limit, High-repetition-accuracy torque,weight limiter ; 2. Unique, and reliable car off-axis device and Trolley Anti broken rope Safety Device; 3.Independent of side driver's cab,its Vision is good,with a large space in the tower crane driver's cab,Using linkage console,Configuration ottoman, convenience, and comfort; 4. Machine appearance as an international pop style, beautiful and generous 5. Long boom, operating a large space, a rigid double-bar suspension, light weight, cross-section is small, air resistance is small, the leading domestic;
- Q: What is the definition of lifting, slewing and luffing of tower cranes?
- Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
- Q: I want to know how to make the best and easyist paper crane with origami.
- find the instructions online...and fold them. crease the folds a lot so it is more crisp...that's about all i can tell you, because i can't give you the instructions.
- Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
- In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.
- Q: What prior education and skills are needed to become a Crane operator ?
- idk
- Q: I am Dr Crane is there anything you would like to know? i can answer all your questions?
- So happy Dr. Crane that you are on the Yahoo Questions and Answers. 1. Why am I so sad?
- Q: for example: erection, technical data...
- Well now Slartybardfast may be tried lol but he is correct give him the points lol.
- Q: Hi! I'm only going into 9th grade, but I'm getting a head start on chooising a college. I am absaloutley positive I want to be a musician. Hopefully a singer/songwriter, but my plan B is music production. So, I'm going to put Juliard aside (lol)and here are my choices right now:Crane School of Music,Fredonia School of Music,and Berklee School of Musicplease give me your opinion on those schools, and if you could suggest any others, please do. I need all the information I can get...Ive been doing alot of research but now I need other people's opinions. thanks :)
- Fredonia School Of Music
- Q: electromagnetic crane
- Current sent through a coil of wire creates a magnetic field, which can be used to pick up ferromagnetic objects. Turn off the current, and the field will turn off (although it might take a few seconds to turn off all the way), dropping the object.
Send your message to us
Tower Crane TC7034 Construction Equipmen Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords