Tower Crane TC7021 Construction Equipment Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7021 Description:
1.CMAX Tower Crane TC7021 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7021 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7021 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7021 Parameter:
Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 40、45、50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 2.1
Tower Crane TC7021 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7021Diagram:
Tower Crane TC7021 Technical Sheet:
Tower Crane TC7021 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:is this normal? I mean VERY VERY afraid. I mean i won't scream but if i see a someone (except other guys) i will hug them tightly and beg for them to kill them... and how can i change this?
- everyone has fears youre either going to have to face them or learn to live with them
- Q:LCS , MCS , HCS?
- Lots of good replies already for this question
- Q:What is the allowable range of vertical deviation for tower cranes?
- The specified installation, construction, demolition of tower crane safety technical regulations in JGJ196--2010: the allowable deviation of verticality Tower: in the wind under no-load, the tower axis line should be less than 4 per thousand of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 2 per thousand. According to the installation state of tower crane, the deviation range of verticality is divided into 4/1000 or 2/1000. Tower crane maximum independent installation height (maximum installation height, does not need to be attached to the wall of the instructions specified in the free end) and height (the highest point of a tower crane attached to the wall above the height, body the following provisions in the specification of tower crane slewing) the vertical deviation range was 4/1000; tower crane attachment verticality deviation below the allowable range is 2/1000.
- Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
- You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
- Q:The war is during 1899, and it's not the Spanish-American war.This isn't assignment, I'm just curious to know.
- Crane was a war correspondent, and had reported on both the Greco-Turkish and the Spanish-American wars. I am surprised you are so sure this poem isn't about the Spanish-American war; I suspect it is about war in general - certainly including the two wars Crane had seen most copiously.
- Q:Information of distributor or manufacturer for Crane Lake Cellars will be helpful too.
- Funny how they use a Napa address, being that Bronco has been under attack by all of the legitamite Napa wineries that pay the huge prices to grow and produce wines in Napa that resent a bulk wine producer buying cheap bulk juice from all over and labelling it with names containing Napa and Rutherford when the crap inside has nothing to do with the AVA's they hint at. They ruined the industry starting with a surplus year with 2 buck chuck pricing (per alcohol content) below boones, olde english 800 and Colt 45. For shame.
- Q:When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
- Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
- Q:I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
- Why do you want to draw an animal that is suffering? Draw something that is positive.
- Q:how do u bring a construction crane down?
- Unbolt it and use a smaller crane, or parts of the large crane to lower them to the street.
- Q:How do cranes use geometry?
- If your referring to cranes in construction cranes, then it might form a right triangle with the ground implying the use of trigonometry which is a part of geometry.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC7021 Construction Equipment Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords