Crane TC7021 Construction Equipment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7021 Description:
1.CMAX Tower Crane TC7021 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7021 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7021 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7021 Parameter:
Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 40、45、50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 2.1
Tower Crane TC7021 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7021Diagram:
Tower Crane TC7021 Technical Sheet:
Tower Crane TC7021 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
- A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
- Q:I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
- I dont know how, maybe polio, but he does have a disability.
- Q:↑ pretty much explains itself. (:~Animal_Lover
- Probably okorder /
- Q:single shard pls need awnser quick 8th grade lit test
- Crane-man is a kindly old man with a crippled and useless leg. Crane-man takes care of Tree-ear and loves him very much. Crane-man can only walk around with crutches, but he still had the upper body strength of a young man. Sadly, at the end of the story, Crane-man dies of a heart attack when he falls into the river next to the bridge and the freezing water kills him. Crane-man outlived all of his family and friends, and unable to work, he was forced to sell all of his possessions, and eventually he ran out of money and came to live under the bridge. A crane, besides standing on one leg, is also a symbol of long life, and this is how Crane-man got his name. Throughout the story, Crane-man displays his generosity and kindness towards Tree-ear, Min, Min’s wife, and other villagers. the link below provides a full synopsis of the book
- Q:What is the Tower crane Roadb track laying criteria?????????
- The okorder ) track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
- Q:Who do you think was better and who would've won if they faced.
- Having seen both in various video clips, I would have to lean towards Irving Crane. Crane was winning world championships from his twenties well into his sixties. Yes, Mosconi has more records and world titles to his name, but most historians agree that his 526 ball run was performed on a 4' x 8' table, which would not have been considered professional conditions. I'm not taking anything away from Mosconi. Crane was a far better defensive player. Personally, I would have liked to have seen Ralph Greenleaf in his prime. So little video footage is available from those years unfortunately. Very good question.
- Q:Denny Crane (played by William Shattner), and Alan Shore (played by James Spader) are partners in a Boston law firm. I would like to know if those those two are father and son in the series,
- No. They're just partners. Freddie Prinz Jr. Guest starred on i think 2 episodes as Denny Crane's son.
- Q:will give you a wishor help your marraige succeedjust curious as to peoples thoughts?thanks lt;3 abby
- No, that's some made up Shinto belief. People want to believe that because if they spent all their time making 1000 paper cranes and it turned out they don't get a wish, they would be really pi$$ed off.
- Q:i have a 83 camaro crane cam 305 v 8 4brrl edelbrock carb and i just changed the carb from a quadrajet to the edelbrock....but i cant seam to get it running right as long as im out on the highway it runs great but when i stop at a stop light i have to rev it up to keep it running..i changed the plugs plug wires and the distributor but i heard you have to have a different kind of distributor to change from the quareajet ( will all of the plug in and stuff to a regular edelbrock carb..is this true??
- If you can get vacuum from the intake manifold to the distributor advance, there is no reason to change distributors. You may need to re-jet the idle. Also if the cam is too steep and/or the carburetor is too big, the engine will flood. Check with Crane on timing changes and idle settings. The idle may need to be set up a little.
- Q:can u have a small dog w/u when u are operating a crane?
- I can't imagine any employer allowing that condition to exist. A crane operator's attention must be on the job at all times. If the dog were to do something unexpected at a critical time, the operator may be distracted and lose control of the load.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Crane TC7021 Construction Equipment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords