• Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 1
  • Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 2
  • Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 3
  • Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 4
Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7021 Description:

1.CMAX Tower Crane TC7021  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7021  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7021  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7021  Parameter:

 Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 40、45、50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 2.1


Tower Crane TC7021   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7021Diagram:

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Technical Sheet:

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: What is the difference between crawler crane and tower crane?
Difference:1, tower crane tower body (lower) stand up like a tower, so called tower crane; crawler crane slewing below is tracked chassis, like crawler tractor chassis.2, tower cranes are generally used in high-rise building construction, lifting and attaching, arm pole is very long, construction site is very common. Crawler crane is used in municipal engineering, such as subway, bridge and so on.3, the tower crane jib with flat arm, arm, is mainly composed of steel frame. Crawler crane boom is mostly steel frame, similar to the tower crane boom.
Q: like a really really clear set of instructions. or a video. but evrything i have tried confused me.
This okorder
Q: How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
Renovation of skyscrapers typically uses a crane, if it has one, that is built up the side of the building, resting on the ground but fastened to the frame periodically for bracing. Tower cranes are built in sections and assembled in place with smaller cranes. To a large extent, renovation of skyscrapers is done from the inside - modifying some of the existing elevators, rather than doing anything from the outside, breaking through the walls to get stuff inside.
Q: I have these sand cranes that always come up to our house and we feed them bread they never were aggressive but now one certain one is getting more aggressive. We have a screened porch and they come up to it and there putting holes in it to get our attention and there making like a noise thats not that normal when they see us. The one certain one is getting more aggressive towards the other birds poking on the them and chasing them. There is a group of four and they always stay together. the other three arent as aggressive as the one. He is bigger then the rest of them and is almost like the boss you could mostly tell he was before. He always let the other eat first while he watched around and when we gave them bread he used to be the last one up there now hes the first one there and literally runs to us when he sees us.
Sounds like the aggressive is the Dominate male of the herd. I know you like to feed them but that's what started the problem. He is being Dom so he can get more food and be the first to eat. Once they figure out you're not going to feed them they will go back to behaving normal. These are cool to look at, even though they can get loud sometimes. Have you ever seen tourist feed sea-gulls at the beach. Locals don't do it. Sea Gulls will get as aggresive as the Sand Cranes and actually dive bomb people. Imagine what a Sand Crane can do being what 10 times the size
Q: The truck has a Comprehensive Motor insurance cover. There is no exclusion in the policy in respect of tools of trade.
read your insurance policy.
Q: If the crane Dawkings refers to about natural selection is not operating or existing by chance, then some questions arise:1) who or what is operating the crane?2) if its self operating, how is it programmed to do so?3) who made the crane?And about designing the designer, No one did. Otherwise the crane would be lifting the operator of the crane into the crane. I guess the crane can operate by itself, but then stopped doing so when something designed the designer. Too many philosophical conundrums for me. The belief in an unified, and self-complete, creator is far less of a complex explanation than the 'crane' concept with all its requisite philosophical flamings hog's heads.
Bit by bit you may come to realise that complexity out of simplicity is much easier to comprehend than complexity from nowhere. The crane idea is from Daniel Dennet I think, and the boeing being assembled by chance is more or less what happened only bit by bit through evolution and natural selection. God is the complexity from nowhere to which I refer. Self-complete creator? did he make himself?
Q: Today, a crane collapsed on the Grand Mosque in Mecca, killing 87 people. Is God punishing Muslims for 9/11?
Lightning okorder
Q: Whats does the japanese crane symbolize?
The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
it climbs the tower as the tower goes higher. the crane has 8 mechanical legs that it lift it self mechanically.like a spider in a tree or as the tower goes higher workers add a piece at the bottom of the crane using hydraulics

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords