Tower Crane TC6520 Max Lifting Capacity 10Ton
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6520(QTZ160)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
Specification of Tower Crane
Technical Sheet for TC6520
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 55、60、65 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 10 | ||||
Tip load @ 65m(t) | 2 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF250M1-6-45KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YZPBE132S-4-5.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YTW112M-4-5.5KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 21.3 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 63 | ||||
Power supply requirement (KVA) | 230KVA for generator | ||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||
Startup voltage & current | 380V×95%=361V 219A | ||||
Rated working voltage & current | 380V 121A |
Loading diagram:
65m jib length:
R | 20 | 25 | 30 | 35 | 40 | 46 | 48 | ||
a=2 (t) | 5t---29.1m | 4.84 | 4.1 | 3.53 | 3.02 | 2.87 | |||
a=4 (t) | 10t---14.73m | 7.33 | 5.8 | 4.77 | 4.03 | 3.46 | 2.95 | 2.8 | |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 | 65 |
a=2 (t) | 2.74 | 2.62 | 2.5 | 2.4 | 2.3 | 2.21 | 2.12 | 2.04 | 2.00 |
a=4 (t) | 2.67 | 2.55 | 2.43 | 2.33 | 2.23 | 2.14 | 2.05 | 1.97 | 1.93 |
60m jib length:
R | 20 | 25 | 30 | 36 | 38 | 40 | 42 | ||
a=2 (t) | 5t---35.67m | 4.95 | 4.67 | 4.42 | 4.19 | ||||
a=4 (t) | 10t---18.15m | 9.06 | 7.2 | 5.94 | 4.88 | 4.6 | 4.35 | 4.12 | |
R | 44 | 46 | 48 | 50 | 52 | 54 | 56 | 58 | 60 |
a=2 (t) | 3.98 | 3.79 | 3.61 | 3.45 | 3.3 | 3.16 | 3.03 | 2.91 | 2.8 |
a=4 (t) | 3.91 | 3.72 | 3.54 | 3.38 | 3.23 | 3.09 | 2.96 | 2.84 | 2.73 |
55m jib length:
R | 20 | 25 | 30 | 32 | 34 | 36 | 38 | ||
a=2 (t) | 5t---37.75m | 4.97 | |||||||
a=4 (t) | 10t---19.23m | 9.61 | 7.64 | 6.31 | 5.89 | 5.52 | 5.19 | 4.90 | |
R | 40 | 42 | 44 | 46 | 48 | 50 | 52 | 54 | 55 |
a=2 (t) | 4.70 | 4.45 | 4.23 | 4.03 | 3.85 | 3.67 | 3.52 | 3.47 | 3.3 |
a=4 (t) | 4.63 | 4.38 | 4.16 | 3.96 | 3.78 | 3.6 | 3.45 | 3.3 | 3.23 |
Images of Tower Crane
FAQ about Tower Crane
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q: How should I go about stringing paper Cranes together??I alreadly know how to make them, its just that I have no clue how to put them together
- Depends how you want to string them... but use thread and a needle. If you want to string them vertically, put the needle through the body of the paper crane... I not sure about horizontally. Too keep them in place, place knots below the body of the crane. I hope this helps, but I hope another more experienced person answers this :P
- Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
- The okorder
- Q: how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- Usually it is the rigger who attaches the lifting gear not the crane operator who needs to know about centriods and even then the real trick is getting the slings or other lifting devices in the exact place. That tends to be a bit of trial and error unless the lifting points are clearly marked.
- Q: I know, do you know?
- Usually another crane is used to hoist modular sections an erect the crane. Some large construction cranes build themselves using modular tower sections. The boom and crane cab lifts itself on a track, the crane lifts a modular section of tower from the ground, and inserts it under the cab. The top lifts itself up and starts again. Check out the video below. Incidentally, enormous blocks of concrete are poured on the ground to support cranes like this one, and are too massive to remove when construction is complete. So, many tall buildings have huge monolithic hunks of concrete in the ground at their base....
- Q: QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
- All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
- Q: Firstly I know there is a very good club near me which does 5 lessons a week, just to let you know.Firstly could you please tell me how much of white crane is actually fun and how much percentage is kicks and how much punches.I'm a very althletic boy age 15 and I don't know much about this style. Is it fairly exciting and what I might enjoy?Thanks for you help.
- White Crane Kung Fu combines defense and attack and uses both soft and hard power. It also emphasizes firm yet evasive footwork. It is a direct, linear and deceptive martial art. This particular system is called Fei He or Flying Crane. Flying Crane makes use of both high and low kicks yet has a marked preference for rapid hand techniques. It stresses empty-hand as well as weapons training, two-person sets, self-defense drills and free-sparring.
- Q: I need a web site for crane documentation. What I need, is a site, where from I can get, when needed, hydraulic and electric schematics for all kind of cranes (crane trucks, bridge cranes, etc)Thank you,
- Go to the manufacturer's websites for technical support. Go to the engineering magazine websites that engineers use to design the cranes. Identify the professional engineering organizations that deal with such equipment.
- Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- The cranes hook to the side of the building and climb the steel frame as it is being built. The crane can only reach a few stories so it has to climb each story's steel frame as it is finished.
- Q: I wanna get my gf this nice necklace but I suck at the crane games. Is there a way to cheat?
- a partial cheat that i use is 1st looking to see which items are at least open enough to get 2nd when i start up i get to the item then to go the left and right of item and adjust which way i go then try to aim for the middle of the item wanted then there is an 80 % chance that i will get the item i am aiming for but some of those crane games are rigged to the point you have to go at least 2 or 3 times depending on what type items are on there because the crane arm looses strength especially if it is far away from the exit hole
- Q: What are the main parameters of a tower crane?
- Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Send your message to us
Tower Crane TC6520 Max Lifting Capacity 10Ton
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords