• TOWER CRANE TC6014S System 1
  • TOWER CRANE TC6014S System 2
  • TOWER CRANE TC6014S System 3
  • TOWER CRANE TC6014S System 4
TOWER CRANE TC6014S

TOWER CRANE TC6014S

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q: i have a 83 camaro crane cam 305 v 8 4brrl edelbrock carb and i just changed the carb from a quadrajet to the edelbrock....but i cant seam to get it running right as long as im out on the highway it runs great but when i stop at a stop light i have to rev it up to keep it running..i changed the plugs plug wires and the distributor but i heard you have to have a different kind of distributor to change from the quareajet ( will all of the plug in and stuff to a regular edelbrock carb..is this true??
Is the edelbrock carb new or used? You may have a defective carb if used and needs to be rebuilt. If you reinstall the q-jet, does the problem go away?? good luck......
Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
Yes i stayed at the Crane,you must have a car....I had my black escalade at the time...so am not sure about shuttle service.
Q: Where can I get the tower crane manufacturing permit?
This is the permit of the Bureau of quality supervision
Q: Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.
Q: If there was a fight between Stefano DiMera and Allistar Crane, who would win?
stephano dimera wrote the book allistar crane is using. stepano hands down.
Q: Who do you think was better and who would've won if they faced.
Gotta go with Willie. The only match I ever saw Mosconi play was in Chicago back in 1964. He was down 46 to 14 going to 150. When he got to the table he ran 136 and out for the win. It was incredible. I never saw Crane in person and saw only one film of him. He ran 150 and out on Cowboy Jimmy Moore. A good friend of mine was telling me a story about the time he was in Johnston City, Illinois. Richie Lawrence was at the table. My friend was seated in front of Crane. As Richie was shooting, Irving Crane was telling his friend what Richie should be shooting every shot. Richie did just the opposite every time. The neat part about it was... Richie ran 150 and out... and never shot the right ball. Gotta give Willie the edge. Good question.
Q: I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
I dont know how, maybe polio, but he does have a disability.
Q: How do you get a crane down from a tall building once it's completed?
In the US most are called Tower Cranes and they actualy lower them selves down part way then using Mobile Cranes they diss asemble them the rest of the way
Q: Formulas for calculating outrigger pad sizes, centre of gravity of loads, outrigger loadings
If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
Q: what are Gantry cranes?
You could have saved two points if you'd googled this question

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords