TOWER CRANE TC6014S
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: can somebody give me good info on this. its a martial art im very interested in leaning and i would like some background info on it first thx
- There are several different kinds of Crane Kung Fu. There is the Fujian White Crane Kung Fu and there is the Shaolin Crane Kung Fu, just to name two. I like Crane Style Kung Fu because it is a graceful style that relieves stress.
- Q: i need the names of the organisms. like names of insects or fish or what ever they eat. give the organism's name. don't just say fish or insects. i need specific names.this is for a biology project.
- Diet okorder /.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
- Q: I'm talking about the movie, for those of you who have seen it. If you have seen it, you can probably recall one of the final scenes where head Gamemaker Seneca Crane is being walked to his death by two Peacekeepers. I really want a picture of this! Why? Because the Peacekeeper on the right is my dad! I think it would be awesome if I could get him a picture of this since he is so proud of it! So if anyone knows where I can find a clip of this scene, or knows where I could get a picture, could you please tell me? I'd really appreciate it! Thank you!
- I don't think it would be out there yet, as the movie just came out. I would try searching Seneca Crane and then your dad's name. You also might be able to find it on YouTube. It's really cool that your dad was in the movie!! Good luck finding the picture!
- Q: open boat by stephen crane
- The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
- Q: how do u bring a construction crane down?
- That's a perfect application for a sky hook.
- Q: What is a "crawler crane" and what kinds of jobs is it good for?
- *A crawler is a crane mounted on an undercarriage with a set of tracks (also called crawlers)that provide for the stability and mobility of the crane. Crawler cranes have both advantages and disadvantages depending on their intended use. The main advantage of a crawler is that they can move on site and perform lifts with very little set-up, as the crane is stable on its tracks with no outriggers. In addition, a crawler crane is capable of traveling with a load. The main disadvantage of a crawler crane is that they are very heavy, and cannot easily be moved from one job site to the next without significant expense. Typically, a large crawler must be disassembled and moved by trucks, rail cars or ships to be transported to its next location. Crawler cranes range in lifting capacity from about 40 US tons to 3500 US tons.
- Q: You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
- these cranes are self raising. as they need to go higher they raise themselves up on hydraulic jacks and another section is bolted in the gap that is left. i hope this will answer your question
- Q: I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
- But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
- Q: my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
- Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
Send your message to us
TOWER CRANE TC6014S
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords