Tower Crane TC5613 QTZ80 Main Section for Sale
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5613(QTZ80)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC5613
Free standing height (m) | 46 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 44、50、56 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 56m(t) | 1.3 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 14.1 | ||||
Mast section size(L×W×H)m | 1.8×1.8×2.5 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Loading diagram:
56m jib length:
R | 2.5—13.7 | 14 | 20 | 24.9 | 26 | 32 | 35 | 38 | 44 | 50 | 56 |
a=2 | 4t—24.9m | 3.80 | 2.94 | 2.63 | 2.36 | 1.94 | 1.63 | 1.38 | |||
a=4 | 8t—13.7m | 7.79 | 4.12 | 3.92 | 3.72 | 2.86 | 2.55 | 2.28 | 1.86 | 1.55 | 1.30 |
50m jib length:
R | 2.5—15.1 | 16 | 22 | 26 | 27.6 | 32 | 35 | 38 | 42 | 50 |
a=2 | 4t---27.6m | 3.34 | 2.99 | 2.70 | 2.37 | 1.88 | ||||
a=4 | 8t-15.1m | 7.48 | 5.15 | 4.22 | 3.92 | 3.26 | 2.91 | 2.62 | 2.29 | 1.80 |
44m jib length:
R | 2.5—16.3 | 20.9 | 26 | 29.8 | 32 | 35 | 38 | 40 | 42 | 44 |
a=2 | 4t---29.8m | 3.69 | 3.31 | 2.99 | 2.79 | 2.63 | 2.48 | |||
a=4 | 8t---16.3m | 6.0 | 4.64 | 3.93 | 3.61 | 3.23 | 2.91 | 2.72 | 2.55 | 2.40 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I've recently finished folding my 1000 paper cranes. I herd that there is a shrine in japan that takes them. Anybody know where that place is and the information I need to have to send them?
- The most common place to take them is the Hiroshima Peace Memorial Park. They have a monument dedicated to a girl who was affected by the bomb and died from cancer. Her name was Sadako and they have these glass cases that people from all over the world put their 1000 cranes in. Here's a link to their website... www.pcf.city.hiroshima.jp/index_e2.html You might have to call first...good luck!
- Q:I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
- Flares are used to burn off oil and gas that can not be transported to be processed without extensive costs. They can also be used at refineries as a safe way to release gas build ups in case of problems in the refining process occur. I imagine that a flare boom could be on the end of the crane but I know it's not always the case. The crane does what cranes do best... move things, usually from the ship to the platform or vise versa.
- Q:i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
- I spent a year walking to work past a tower crane that was being used for a high rise apartment building in Philadelphia. I don't recall ever seeing it parked pointing in the same direction two days in a row.
- Q:In the private training session, Katniss Everdeen creates a noose, hangs a practice dummy, and uses the paint to write: Seneca Crane. I know this name is mentioned earlier in the book, but I don't remember who Seneca Crane is... Remind me, please?
- Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.
- Q:I can't seem to find the item I'm looking for on-line. Maybe some fellow crane operator happens to know where I can find this. It's a quick releasing crane hook, it drops the load on cue. I think it would probably be remote-controlled.
- What load rating are you looking for? I am familiar with heavy lift cranes and smaller ones that do not have any sort of release device that you are looking for. Most rated crane hooks have to be qualified to carry that load and any quick release feature could fail, dropping the load. Maybe you could find such a hook for a non-industrial application, but I have never seen anything like this in use.
- Q:how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q:Can Ichabod Crane defeat the Headless Undocumented Worker before he prunes someone's bushes into hedges?
- Not if they are illegal Mexican migrants.
- Q:Romney woulda had that thing fixed by now.
- Private company owns the crane.
- Q:Minimum QTZ63 tower crane special electric box open for many A
- QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
- Q:Four for crane, two for insurance, two for insurance. What does that mean?
- Refers to the air switch and the electric leakage protector in the electric tray.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC5613 QTZ80 Main Section for Sale
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords