• QTZ4808 Tower Crane Spare Parts for sale System 1
  • QTZ4808 Tower Crane Spare Parts for sale System 2
  • QTZ4808 Tower Crane Spare Parts for sale System 3
QTZ4808 Tower Crane Spare Parts for sale

QTZ4808 Tower Crane Spare Parts for sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of tower crane

Name: qtz4808 tower crane tower crane spare parts

CMAX Tower Crane is one of the main product of CNBM company and is suitable for all kinds of construction project and all kinds of work condition.CMAX Tower Crane adopts standard section hydraulic lifting and connecting and high high working speed, good speed-adjusting performance, steady operation and high efficiency. CMAX Tower Crane also has Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction and complete set of safety devices. CMAX Tower Crane machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.CMAX Tower Crane has has scientific layout and beautiful appearance. CMAX Tower Crane operator's room is set independently on one side, with good vision field.


Main Features of tower crane


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

tower crane Images

QTZ4808 Tower Crane Spare Parts for sale

QTZ4808 Tower Crane Spare Parts for sale

QTZ4808 Tower Crane Spare Parts for sale

QTZ4808 Tower Crane Spare Parts for sale

QTZ4808 Tower Crane Spare Parts for sale

QTZ4808 Tower Crane Spare Parts for sale

tower crane Specifiction

QTZ4808 Tower Crane Spare Parts for sale

FAQ

 

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: i saw a PS3 in a claw crane game at Six Flags Over Georgia i wonder how you can win it. It is possible to win it... somehow. I thought that the strategy was to lift the prize that is closest to the hole. I almost won a Kinect that way. So are there any other strategies??? Don't say buy 1 or there isnt a way to win because there is.
The crane machines work in such a way as to only make the claw strong enough to hold prizes after a certain amount of attempts so as to limit the amount of prizes taken.
Q: Remember. You heard it here first.
It's okorder /.... Judging by the fact that a Google search results in many different companies/aircraft that incorporate the term 'air crane', I would say so. But it seems that the term is usually associated with heavy-lift rotorcraft. It also appears that the term is in the public domain. So, you could call it 'JV's Air Crane' or something like that. I've Googled SkyLift, AirLift, Zeplift- all taken However, DiriLift, DirigiLift,and ZepCrane yielded no results. *I relinquish all rights to these terms
Q: Is tower crane a tower crane?
Yes, the tower crane is commonly known as the "standard" in the industry. It is called tower crane.
Q: for my homework : the question was explain how a skyscraper crane uses physics moments but no where can i find out the answer and dont want a detention ekkk x
OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
Yep, they use a smaller crane that sits on the back of a truck and has a telescopic arm, it only takes a few days. There's a lot of construction going on in my city and I've seen them do it.
Q: A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m. Calculate the work the crane performs.
W=Fdcos(angle) W=mgh=2355(7.56)=17803.8 J
Q: how do cranes get assembled ? on building sites?
They use hydraulic mobile cranes, (they're telescopic). I watched a crane being disassembled on a building site near my home. How did they do it before they had these mobile cranes? In Switzerland, in places where there are no roads they use helicopters.
Q: Is the first entry into the construction project? Or direct access to fixed assets?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month
Q: how to build a crane using:woodelasticsgluescrews/boltsbottlessyringesnailsplastictin canand rubber tubingplease be detailed,thanks! :)
Carefully. okorder has kit numbers and downloadable instructions for many Lego cranes. You might be able to find some of them on OKorder. You may not need to actually build the Lego crane. Instead, look at the model, determine the major pieces (wheels, turntable, arm, etc.). Then, look at your bundle of pieces and make something with the same function.
Q: A site would be nice...
I just used that poem for a project!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords