Tower Crane TC5013A Panel Mast Section for Sale
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5013A(QTZ63)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC5013A
Free standing height (m) | 40 | ||
Max height with attachment (m) | 121 | ||
Working range can be adjusted(m) | 44、50 | ||
Min working range(m) | 2.5 | ||
Max lifting capacity(t) | 6 | ||
Tip load @ 50m(t) | 1.3 | ||
Hoist mechanism | Falls | 2 | 4 |
Lifting capacity(t) | 1.3-3 | 3-6 | |
Speed(m/min) | 9/38/80 | 4.5/19/38 | |
Motor | YZTD225L2-4/8/32-24/24/5.4KW | ||
Trolleying mechanism | Speed(m/min) | 20/40 | |
Motor | YZTDE132S-4/8-3.3/2.2KW | ||
Slewing mechanism | Speed(r/min) | 0.6 | |
Motor | YZR132M2-6-3.7KW | ||
Climbing speed(m/min) | 0.5 | ||
Counterweight(t) | 44m jib length | 50m jib length | |
9.5 | 11 | ||
Mast section size(L×W×H)m | 1.6×1.6×2.5m ( Panel type ) | ||
Working temperature | -40-+60℃ | ||
Total power (KW) | 34 | ||
Power supply requirement (KVA) | 180KVA for generator | ||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||
Startup voltage & current | 380V×95%=361V 285A | ||
Rated working voltage & current | 380V 93A |
Loading diagram:
50m jib length:
R | 2.5-14.04 | 16 | 18 | 20 | 22 | 25.8 | 30 | 36 | 40 | 44 | 50 |
a=2(t) | 3.00 | 2.50 | 2.00 | 1.75 | 1.54 | 1.30 | |||||
a=4(t) | 6.00 | 5.16 | 4.50 | 3.97 | 3.55 | 2.90 | 2.43 | 1.93 | 1.68 | 1.47 | 1.23 |
44m jib length:
R | 2.5-14.4 | 16 | 18 | 20 | 22 | 26.5 | 30 | 34 | 38 | 40 | 44 |
a=2(t) | 3.00 | 2.59 | 2.22 | 1.93 | 1.82 | 1.60 | |||||
a=4(t) | 6.00 | 5.32 | 4.64 | 4.10 | 3.66 | 3.00 | 2.52 | 2.15 | 1.86 | 1.74 | 1.53 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: i was reading this chapter in the book Catching fire (part of the Hunger Games Series) and this one part said she wrote Seneca Crane on the dummy with mud,, who is Seneca Crane?
- u know at the end of the hunger game book...when katniss and peeta were both bout to put the berries in their mouth? and then the announcer said..no no no..and u both win, rite? the announcer was seneca crane...the capitol was mad at him for doing that so they killed him...:(
- Q: Is a mobile crane allowed to operate in an inclined plane?
- It has been my experience that cranes like to be level, and not operate unless they are level. But, I am no expert.
- Q: I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
- Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
- Q: He hasnt been in the military before, so how long would he be gone for boot camp and all that? What is the pay, does he get paid for going? I need to know it all. I am a stay at home mom that doesnt work, so we would need to earn money somehow.
- earning okorder /
- Q: A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
- the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
- Q: Have to make 10 of them so yeah very useful 2 me:) thanks.
- Here okorder /
- Q: How to improve the stability of tower crane
- Increase the overall weight of the base and weight, the tower structure to be strengthened.Crane wire rope is phosphate coated steel wire, galvanized steel wire, stainless steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope double - phosphating coating.
- Q: in design of steel structures as per asce2005 or ibc2006 ,what load combinations are to be considered when crane loads and seismic loads are present?
- Uh, depends on if you're using ASD or LRFD load cases out of ASCE 7-05. I also think IBC 2006 sometimes changes the fine print and also offers their own load cases for ASD and LRFD. A starting point (LRFD case 5 ASCE 7-05) might be 1.2D+1.0E+ L, and for ASD - case 6 - D + 0.75(0.7E) + 0.75L.
- Q: Does anyone know where I can locate a print or lithograph of the chromolithograph done in the 1850's of William John WIlgus' Ichabod Crane and the Headless Horseman?
- Ichabod Crane, Respectfully Dedicated to Washington Irving. by William J. Wilgus, artist chromolithograph, c.
- Q: When should a crane be load tested?
- if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: ? Below the hook lifting devices ? Hoists ? Hooks ? Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. ? Standard inhouse 50 ton load testing capacity. ? Ability to test higher load capacity devices (Up to 5,000,000 pounds). ? Have tested up to 640,000 pounds (320 tons). ? Engineering manufacturing available to provide lift fixtures for test purposes. ? Can provide nondestructive testing of critical welds and critical locations. ? Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. ? Calibrated test weights available. ? Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. ? Certificates of Test and/or Test Reports can be provided. ? Can provide onsite load testing services, including supply of calibrated weights.
Send your message to us
Tower Crane TC5013A Panel Mast Section for Sale
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords