• QTZ63 TC5612 6 tons Tower Crane for Sale System 1
  • QTZ63 TC5612 6 tons Tower Crane for Sale System 2
  • QTZ63 TC5612 6 tons Tower Crane for Sale System 3
  • QTZ63 TC5612 6 tons Tower Crane for Sale System 4
  • QTZ63 TC5612 6 tons Tower Crane for Sale System 5
  • QTZ63 TC5612 6 tons Tower Crane for Sale System 6
QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale

QTZ63 TC5612 6 tons Tower Crane for Sale



Tower crane Specifiction

QTZ63 TC5612 6 tons Tower Crane for Sale

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q: could someone give me a good summary on the red badge of courage, and yes i did read the book and i have trouble understanding, and help would be good thanks!!
I can't help you. I read that book a few years ago, and I hated it so hard.
Q: i have an echo-1 m8a4 cqb it has a crane stock that fits a 9.6 1500mah battery but it wont fit a 2000mah so i want to switch to a full stock but im haveing trouble figuring out how to switch them. does anyone own this gun and know how to do it?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
Q: i want to go to school and learn to operate over head cranes
A few places to start the bureau of labor statistics has information on moving trades. You will need certification although requirements vary. The National Commission for the certification of Crane operators lists different types of operators and requirements for certification. States have their own laws about certification and requirements you can check it out, in some states certification is not required yet. I've included a link to the laws for Minnesota. There are a number of companies it would probably help if you are currently working in Construction and for a company that might help pay for the training or learn on the job. I don't know what state your in but there are a number of companies that do training you can do a quick search with Crane operator training. One other resource is the local Division of DET Division of Employment and Training for your state they can help you research your options and vocational counseling. Good Luck
Q: my class is supposed to start reading poems/short stories by Stephen Crane.why should i look forward to his work?
Well, you know he lived in the late 1800s, so you probably have an idea of what his poetry will sound like. Then you read some of it, and the effect is sort of like walking into what you think is going to be a prissy hair salon and being whacked over the head with a bunch of bananas wielded by a glow-in-the-dark green monkey from Jupiter. Crane's stuff is that weird. And I mean that in a good way.
Q: Please help. I need real answers.
About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
Q: Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q: Whats does the japanese crane symbolize?
The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
It is the work level of the organization, representing the working hours and load sizes of the institution. See GBT/13752 or GBT/3811 for specific explanations.
Q: This has nothing to do with travel, I'm just curious. I hate it when the news doesn't follow up on stories they focused on earlier. Does anyone have a status update on that crane that was swaying in the wind during Sandy?
My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker
Q: Just curious... I'm not in construction and always wondered...
little pieces by welly chopper

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords