• Tower Crane TC5516 Construction Equipment Wholesaler System 1
  • Tower Crane TC5516 Construction Equipment Wholesaler System 2
  • Tower Crane TC5516 Construction Equipment Wholesaler System 3
  • Tower Crane TC5516 Construction Equipment Wholesaler System 4
  • Tower Crane TC5516 Construction Equipment Wholesaler System 5
  • Tower Crane TC5516 Construction Equipment Wholesaler System 6
Tower Crane TC5516 Construction Equipment Wholesaler

Tower Crane TC5516 Construction Equipment Wholesaler

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC5516 Description:

1.CMAX Tower Crane TC5516  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5516  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5516  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5516  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5516  Parameter:

 Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 44

Max height with attachment (m) 150

Working range can be adjusted (m) 44、50、55

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.6 


Tower Crane TC5516   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5516 Diagram:

Tower Crane TC5516 Construction Equipment Wholesaler

Tower Crane TC5516 Construction Equipment Wholesaler


Tower Crane TC5516 Technical Sheet:

Tower Crane TC5516 Construction Equipment Wholesaler

Tower Crane TC5516 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: how do they get counter-weights onto high cranes?
the okorder i have attended a lot of seminars, read counless books on forex trading and it all cost me thousands of dollars. the worst thing was i blew up my first account. after that i opened another account and the same thing happened again. i started to wonder why i couldn,t make any money in forex trading. at first i thought i knew everything about trading. finally i found that the main problem i have was i did not have the right mental in trading.
Q: how to do tower crane maintenance?
Tower okorder /
Q: in the Open Boat by Stephen Crane, in part IV why are the characters not identified?
The characters are defined by their roles on the boat. Their previous experiences or personalities don't matter here. It is just the narrow repetitive experience of rowing and how they each contribute to it. Each character is Everyman, being thrown around by the merciless, indifferent hand of Fate. I think that Crane was squarely in the company of Naturalists (they think there's no such thing as individual agency, like Darwinism in fiction). The interesting thing to think about here is that one character has a name - Billie, the oiler. Why is this? He's the strongest, he's the most experienced and he's the one that dies. He's an individual to the reader but Fate doesn't care. I'm sure you can flesh the ideas out now.
Q: Well I folded 100 or so cranes from cheap origami paper (red, yellow, green and blue) before I decided that I could fold 1000 cranes a reality. My dilemma is, do I keep the 100 cranes I did and fold 900 of them to fulfill my wish? Or if I discard the 100 cranes and fold 1000, will my wish be granted on the 900th crane? The reason I want to discard the 100 cranes is because it's for my wedding and the color placement of the old cranes isn't fitting at all.Yes I'm aware it's not scientific or realistic, but it's more of faith, I'm not dumb.
Consider what you would like your 100 cranes to mean. Attach strings to your 100 cranes and then hang them in a tree etc so that the wind may carry your prayers where they need to go. Then start again to create the 1000 paper cranes you want for your wedding. PS: The making of the paper cranes involves an act of faith, not the right colour to match your wedding plans. In Japan, the crane represents peace and healing. When we consider the famous Japanese art-form of paper folding (origami) the crane comes to mind before all else. Sadako and the Thousand Paper Cranes (1977), a non-fiction children’s book written by American author Eleanor Coerr, tells the story of young Sadako Sasaki who lived in Hiroshima at the time of the atomic bombing. Sadako developed leukaemia as a consequence, and lived out the remainder of her short life in a nursing home desperately trying to create one thousand paper cranes. Supposedly, if someone could make a thousand paper cranes his/her wish would come true. Sadako wanted to live. Sadly, she only managed to fold 644 cranes. After her death, friends and family folded the remainder, and buried her with the one thousand paper birds. Today, a statue of Sadako holding an enormous golden origami crane stands in the Hiroshima Peace Park. People regularly leave paper cranes. The plaque on the statue reads “This is our cry. This is our prayer. Peace on Earth.”
Q: WHAT IS A WADDLE CRANE?
Well okorder / but I couldn't find any reference to them being called waddle cranes. While the W on a key board is close to the S, you'd have to miss the TR for waddle to be misspelling of straddle, so I have no idea, sorry.
Q: What is W_safe, the largest weight of the load that is safe to lift regardless of the angle of the crane's arm?
There okorder /
Q: Hi! I'm only going into 9th grade, but I'm getting a head start on chooising a college. I am absaloutley positive I want to be a musician. Hopefully a singer/songwriter, but my plan B is music production. So, I'm going to put Juliard aside (lol)and here are my choices right now:Crane School of Music,Fredonia School of Music,and Berklee School of Musicplease give me your opinion on those schools, and if you could suggest any others, please do. I need all the information I can get...Ive been doing alot of research but now I need other people's opinions. thanks :)
Fredonia School Of Music
Q: A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
Q: Two cranes are lifting identical steel beams at the time.One crane is putting out twice as much power as the other assuming friction is neglible, what can you conclude is happening to explain this difference?
Mechanical advantage. One boom may be at a lower angle than that of the other causing more force to be required to lift.
Q: If you make 1000 origami cranes is it true that you will get a wish or good luck. This is based on a Japanese myth
That depends on your wish. If your wish is to have 1000 origami cranes or your wish is that you become really good in folding origami cranes I would think it will come true. But maybe you could also wish for a smile from every stranger you give an origami crane to as a present, you might not even have to wait until you've made 1000.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords