• CMAX TC4808 Tower Crane Construction Machine System 1
  • CMAX TC4808 Tower Crane Construction Machine System 2
  • CMAX TC4808 Tower Crane Construction Machine System 3
CMAX TC4808 Tower Crane Construction Machine

CMAX TC4808 Tower Crane Construction Machine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
4T
Maximum Lifting Height(M):
200m
Rated Loading Capacity:
4T
Span:
48M
Rated Load Moment:
4T

CMAX TC4808 Tower Crane TC 6016 Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.



FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q: I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
Most cranes are diesel engine powered hydraulics and hydraulic motor. So that would be fossil fuel. Some cranes use pulleys to magnify the total lifting capacity. A pulley magnifies work by exchanging distance for lifting power. For example, to lift a 10 ton weight 20 feet in the air, if you put four pulleys in there so that 80 feet of cable would have to be pulled up , then it would only take 1/4 the amount of power to lift that 10 tons (2.5 ton lifting force would lift it) Look at any links or wikipedia for how compound pulleys work.
Q: This is a new technology in ringging work. Hope anyone can give me some detail information about wireless crane scale.
Hi, okorder for more information
Q: Why is there as much evidence of Icabod Crane, as there is of god??
Both tend to be works of fiction. As fictional characters go, Icabod Crane was far more likeable, and never coerced, threatened, maimed, tortured, or killed anybody. For that reason, I prefer Crane any day.
Q: Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q: please be specific! thank u so much
I have no idea Im trying to find that out too!!!
Q: What is the difference between lifting height of tower crane and independent height?
Of course there is a difference. Independent height refers to the highest height of tower crane in its free state. Lifting height refers to the height of actual tower crane design.
Q: It is a single blade knife very similar to a case sodbuster
There okorder /
Q: More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically,
Q: What was the mekhane (crane) used for in Greek plays?To remove scenery between actsTo lift the king and his court to their viewing boxFor actors playing the godsIt was only used in building and tearing down the set
Behind the stage there was sometimes a crane called the 'mekhane'. Actors could be hung from the crane to play gods or monsters flying through the air. These were early special effects!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords