• TOWER CRANE TC4610 System 1
  • TOWER CRANE TC4610 System 2
  • TOWER CRANE TC4610 System 3
  • TOWER CRANE TC4610 System 4
TOWER CRANE TC4610

TOWER CRANE TC4610

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q: How to calculate the pouring and maintenance of tower crane concrete in valuation?
Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
Q: Preferable short poems or phrases in Chinese.
this one is about cranes We thought they were gulls at first, while they were distant- The two cranes flying out of a natural morning, They circled twice about our house and sank, Their long legs drooping, down over the wood. We saw their wings flash white, Frayed at the black tip, And heard their harsh cry, like a rusty screw.
Q: Please no direct translations. I need the official name of the whooping crane in French.
When I don't know a word and it is not in the dictionary, I enter it in wikipedia and then change the language on the left to see the corresponding article in the other language.
Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q: how do i win stuff in a crane machine?
Deposit many quarters in the machine or make friends with the man who puts the stuff in it. if you're extra nice, he may give you something- it's not his money, so he won't care.
Q: if a crane just shows up and doesn't go what does that mean
Cranes Symbolism
Q: I've recently finished folding my 1000 paper cranes. I herd that there is a shrine in japan that takes them. Anybody know where that place is and the information I need to have to send them?
The Hiroshima Peace Park. I've been there, it is very moving.
Q: what are Gantry cranes?
You could have saved two points if you'd googled this question
Q: Is a crane a type of pulley?
Yes, or can also be a type of bird.
Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
I think it will be hard to tell, the easiest form to calculate is the time to make one crane times 1000. However, as long you fold you will get a little bit exhausted therefore you should add 1/5 of the total times to make of the 1000 cranes, good luck!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords