• TOWER CRANE TC4610 System 1
  • TOWER CRANE TC4610 System 2
  • TOWER CRANE TC4610 System 3
  • TOWER CRANE TC4610 System 4
TOWER CRANE TC4610

TOWER CRANE TC4610

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:Hi, lately I found out how to make origami cranes. I heard somewhere that there's a charity that you can send in origami cranes and they'll help Japan. Can anyone give me this charity? Or any way to help Japan with origami cranes! Thanks!
One okorder /
Q:The question is: A crane has a power of 500watts, and is pulling a 142kg. What is the velocity of the pulling of the crane?Please help and thanks!
I don't remember ever doing a problem like this, but I will try to solve it. P = W/Δt, P = Fd/Δt P = Fv Force required to lift the 142 kg object; F = 142 * 9.8 F = 1391.6 N Therefore; P = Fv 500 = 1391.6*v v = 0.359 m/s So velocity of the crane is 0.359 m/s. Is that right?
Q:would someone who study both white crane kung-fu & ninjutsu be called a mixed martial artist?
technically yes, mixed martial arts is when you study both and mix them, however there is a mixed martial arts rule set which usually means anything goes except the obvious fouls. now can someone studying white crane kung fu and ninjutsu beat someone who practices boxing and sambo ... probably not. also, MMA is a martial sport, not so much as an art, AKA you will spar and maybe compete which means it wont look nice or 'artsy'.
Q:I need step by step information on how to make a paper crane.
For okorder /
Q:if a crane just shows up and doesn't go what does that mean
Cranes Symbolism
Q:What should i do to solve tower crane collapse?
i couldn't figure it out either. try the castle catapult instead.
Q:If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
this okorder
Q:Do cranes, the bird, have any significance in Egyptian or Chinese mythology?
Yes, they do. Look it up over an Internet search engine.
Q:don't its wheel provide the same amount of friction?
the capacity of a travelling crane relates to its resistance to tipping, and is dependent upon wheelbase, which can be extended by use of the outriggers, and counterweight (the big boxy thing at the back of the crane). Every lift requires a firm and stable platform which is what the outriggers provide. For every lift (weight) and reach (how far from the slew point), there is a limiting capacity factor. This is required to be posted within the operator's cab. The actual load lifted may be monitored by a load cell on a running rope (or other location), and through a computer control, limit the actual capacity of the crane.
Q:How to select tower crane type according to the height of building? Seek explanation
The building cornice height within 20m, the building area of each floor within 2000m2 with 800KN.m tower crane 1 units, each increase of less than 1600m2 800KN.m 1 tower cranes;The building cornice height is less than 50m, the building area of each floor within 2500m2 with 1000KN.m self lifting tower crane 1 units, each increase of less than 2000m2 increased 1 1000KN.m self lifting tower crane;The building cornice height is less than 100m, the building area of each floor within 3000m2 with 1500KN.m self lifting tower crane 1 units, each increase of less than 2500m2 increased 1 1500KN.m self lifting tower crane;The building cornice height is above 100m, the building area of each floor within 3500m2 with 1 2000KN.m self lifting tower crane, each increase of less than 3000m2 increased 1 2000KN.m Jack 1 cranes;When the eaves height more than 25m below the 100m, according to each self lifting tower crane with 1 single cage construction elevator, eaves height above 100m with 2 single cage construction elevator;The podium when every floor area is too large, in accordance with the above standard auxiliary tower crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords