• TOWER CRANE PT7023 with safety monitoring control system System 1
  • TOWER CRANE PT7023 with safety monitoring control system System 2
  • TOWER CRANE PT7023 with safety monitoring control system System 3
TOWER CRANE PT7023 with safety monitoring control system

TOWER CRANE PT7023 with safety monitoring control system

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The flat top tower crane is more and more popular among customers with its beautiful appearance and quick and safe disassembly, and its application range is also expanded constantly. The PT series product is the new product with domestically advanced level and capability of international market competition, and the main models include PT5510-6t, PT7023-12t and PT7528-18t.

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

 

 

Tower Cranes (Flat-Top)  

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting heightm

Lifting capacityt

Work rangem

Work rangem

Lifting capacityt

PT5510

6

12.7

55

1

40

PT7023

12

18.1

70

2.3

50

PT7528

18

16.8

75

2.8

60

 TOWER CRANE PT7023 with safety monitoring control system

Q: What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.
Q: Who do you think would win in a battle between Roger Thorpe and Alistair Crane?
Allistar is pretty twisted so I'll go with him!
Q: in the red badge of courage explain the mechanical metaphor crane uses to describe war?
These okorder /
Q: Equipment safety of tower crane
Some use units over profit, not pay attention to safety, small horse cart, overloading seriously, tower crane accident is one of the main source of high incidence. Some manufacturers in order to meet the construction requirements of the enterprise, expand sales, to occupy the market, will be independent of height increase, the boom will be lengthened to increase the tower coverage, this is bound to reduce the stability of tower crane, reduce the rated lifting weight, increased insecurity. There are some private and unauthorized modification of the tower crane tower crane in the assembly, this part of the tower crane for a long time in the second-hand purchase price is cheap, not willing to invest in maintenance, and frequent failure, which should arouse our attention, we should seek truth from facts, according to local conditions, to solicit the views of all parties on the basis of the introduction of relevant the supporting policies to solve this problem. By strengthening the safety management of several aspects of tower crane, it can effectively prevent all kinds of accidents in the process of tower crane use, and play a preventive role. Practice shows that as long as the construction enterprises, factories, construction administrative departments, in accordance with the tower crane detection institutions can each link to do, to strengthen the safety management of the tower crane, can effectively control the incidence of major accident of crane.
Q: what are the application of crane?
To lift and handle heavy objects. Haven't you seen giant cranes lifting big containers ( having automobiles) from docks and placing them on ships?
Q: I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
The use other large cranes. They put them up there piece by piece, and sometimes use cranes on the ground to hold pieces up while they assemble them.
Q: So how does tower cranes and cranes used in constructions make use of mechanical advantage exerted from simple machines such as pulleys and levers?In other words, how does a crane use pulleys and levers?
Is A Crane A Pulley
Q: What does "automatic tower crane" mean less than 100 tons per metre?
When you are working on this crane, the weight between the weight and the weight to the horizontal distance of the crane Center shall not be greater than 100 tons.For example, if the weight and crane center level distance is 10 meters, the maximum weight is 10 tons; if it is 20 meters, the maximum lifting weight is 5 tons; if it is 40 meters, the maximum lifting weight is 2.5 tons.
Q: I read the book and thought of a theory... I think that the headless horseman is just and alter ego Brom Bones alter ego and he wanted to kill Brom Bones for his beloved Katrina Van Tassel... I want to hear your opinions and theories possibly involving what you think Katrina said to Ichabod during the party. That would be nice thank you.
For the best answers, search on this site Seeing as there are no other answers so far, I thought I'd write what I know :) I've never read the legend and the film may have a different ending, but in the film Ichabod returns to New York. x
Q: What Japanese counter word is used for multiple origami objects...such as 1000 cranes?
Japanese doesn't use counter / measure words, but rather other grammatical particles. Only Chinese uses counter / measure words.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords