TOWER CRANE TC6020 double system ensures safety operation
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
|
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q: If a crane fly loses a leg will he be okay? Is it painful for him or do they just 'release' them like a lizard can release it's tail?
- Chances are, it won't be O.K. Some spiders can release their legs, but only if given fair warning (a gentle tug). If the crane fly lost his leg violently, he will probably die from the injury. Whether or not the injury kills him, he will, of course, be more vulnerable to predators. Not to be morbid or cold, because I really do love animals, and hate to see harm come even to the under appreciated invertebrates, but the Crane fly usually only lives a couple of days, so as long as he mated, his job on earth was finished anyway.
- Q: Like those huge cranes on the top of buildings that are being constructed - how do they get them up there???
- With more massive cranes. Sometimes, they will put them up in pieces - and assemble them on top of the building.
- Q: how do they make those tall cranes so TALL?
- They come in sections. First few are fitted with a smaller crane anthe rest fit onto the side of the assembled base and are lifted up via the internal lifting mechanism then they just slot themselves into place forming another level containing a lift for the next piece and so on until the right height is achieved. I'm sure that's how it works. either that or it's magic
- Q: i need a list of materials and a step by step precedure
- obviously he gets attach to his crops... if he didnt show any interest in his field then he will not able to get a good price of his crops, his total output is growing day by day so how could this be possible?this is a source of his income i dont think that he feel any regret for that...his total effort is jus like a father who raise his son n after he get mature he jus leave him on his own decissions,in different ways to proof himself....n on that he feel proud of his son as same as with farmer he feel proud of his hardworks...whn he get appreciation frm others
- Q: my class is supposed to start reading poems/short stories by Stephen Crane.why should i look forward to his work?
- Well, you know he lived in the late 1800s, so you probably have an idea of what his poetry will sound like. Then you read some of it, and the effect is sort of like walking into what you think is going to be a prissy hair salon and being whacked over the head with a bunch of bananas wielded by a glow-in-the-dark green monkey from Jupiter. Crane's stuff is that weird. And I mean that in a good way.
- Q: How do you jump a crane? I know you jack it up but how is that done?
- I have no idea what you mean by jump a crane? What type of crane? Truck mounted, overhead, pedestal?
- Q: my 7 year old son swears that a crane jumper is a type of animal...any one heard of this??
- I googled crane jumper and came up with nothing. Not to say there isn't such a creature, that could be a regional name for it, it might be called something else.
- Q: did stephen crane win any awards?
- Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
- Q: Building a new skyscraper? Tearing down the old Mellon Arena?
- PITTSBURGH -- Construction is continuing downtown on the new, 30-story Three PNC Plaza, which is scheduled for completion later this year. On Saturday, a giant crane from Philadelphia was brought to the construction site on Fifth Avenue to hoist massive steel girders into place. The girders weigh more than 89,000 pounds and will support a third-floor ballroom.
Send your message to us
TOWER CRANE TC6020 double system ensures safety operation
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords