• Tower Crane of Chang Li Model Number  QTZ-63(5013) System 1
  • Tower Crane of Chang Li Model Number  QTZ-63(5013) System 2
  • Tower Crane of Chang Li Model Number  QTZ-63(5013) System 3
  • Tower Crane of Chang Li Model Number  QTZ-63(5013) System 4
Tower Crane of Chang Li Model Number  QTZ-63(5013)

Tower Crane of Chang Li Model Number QTZ-63(5013)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ-63(5013) Description

Feature: Tower Crane

Condition: New

Application: all kinds of construction

Rated Loading Capacity: 5T,6T,8T,10T,12T

Rated Lifting Moment:500KN.m/630KN.m/800KN.m/1000KN.m/1200KN.m

Max. Lifting Load: 5T,6T,8T,10T,12T

Max. Lifting Height:120m/120m/150m/150m/150m

Span: 120m/120m/150m/150m/150m

Place of Origin: Henan, China (Mainland)

Brand Name: YUJIE

Model Number: QTZ-63(5013)

Certification: CE,ISO,BV,SGS

Warranty: ONE YEAR

After-sales Service Provided: Engineers available to service machinery overseas

color: according to the customer's requements

QTZ-63(5013)    Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ-63(5013)  Specification

 Tower Crane of Chang Li Model Number  QTZ-63(5013)

QTZ-63(5013)  Pictures

 Tower Crane of Chang Li Model Number  QTZ-63(5013)

Tower Crane of Chang Li Model Number  QTZ-63(5013)

Tower Crane of Chang Li Model Number  QTZ-63(5013)

QTZ-63(5013)   FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 


 

 

 


Q: how do i make the paper crane from prison break?
i okorder / hard to explain without showing.
Q: I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q: How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Building Cranes
Q: How many tons of tower crane QTZ80A lifting?
Lifting torque = mass * radius of gyration (amplitude). That is to say, the bigger the weight is small.
Q: Once, I pulled a book off a shelf in a library and found a very uplifting message on a sticky note that made my day. It's inspiring me to do the same, only with paper cranes since I love origami. I'm going to college in the city, and I was thinking about writing positive messages on them and planting them everywhere (discreetly, of course). What are your thoughts on this? It sounds fun, but what are the consequences? Is it even that big of a deal, or do you think it's a waste of time?
I love doing things like this! Whenever my friends go to the mall we do this. We put inspirational quotes and images everywhere we can. In the pockets of clothing, on top of the sale signs, all over the cafeteria. There isn't anything wrong with doing it, and people love it! I'm sure the cranes will be beautiful and many people will appreciate them. Be sure to write look inside on the outside of each crane if you're hiding the message on the inside! This is such a cool idea, I'd love it and I'm sure it won't even be a slight nuisance to anyone. Have fun!
Q: is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough bottom elevation? ThirtyI think this is better. Please specify which specification has the relevant regulations. Which page is it? Thank you very much!
When the tower crane is installed in the fertilizer tank, is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough mark
Q: What role does the tower crane torque limiter play?
The torque limiter can play the weight overload or working radius beyond, beyond the technical performance of the tower crane at the moment, immediately cut off their own lifting or variable power source, will send the alarm signal to prevent the occurrence of accidents.
Q: What does "jack up" tower crane 1000KNm mean?
1000KNm means that the rated lifting moment of the tower crane is 1000KNm. That is to say, the 100tm tower crane.
Q: Hi, lately I found out how to make origami cranes. I heard somewhere that there's a charity that you can send in origami cranes and they'll help Japan. Can anyone give me this charity? Or any way to help Japan with origami cranes! Thanks!
One okorder /

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords