• Tower Crane New TC7034 12T with Good Quality System 1
  • Tower Crane New TC7034 12T with Good Quality System 2
  • Tower Crane New TC7034 12T with Good Quality System 3
  • Tower Crane New TC7034 12T with Good Quality System 4
  • Tower Crane New TC7034 12T with Good Quality System 5
Tower Crane New TC7034 12T with Good Quality

Tower Crane New TC7034 12T with Good Quality

Ref Price:
$40,000.00 - 200,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details of TC7034 Tower Crane     


Feature: Tower Crane                          

Condition: New                                           

Max.Lifting Load: 12T

Span: 70m                                             

Place of Origin: China(Mainland)              

Model Number: TC7034         

 

 

Packaging & Delivery of TC7034 Tower Crane     


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Specifications of TC7034 Tower Crane     

  

● Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

 
● Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.


● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.

Free standing height (m)

50

Max height with attachment (m)

200

Working range can be adjustedm

5055606570

Min working rangem

2.5

Max lifting capacityt

12

Tip load @ 70mt

3.4

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

03

06

06

012

Speedm/min

080

040

040

020

Motor

YZPBF250-4-55KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132M-4-7.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YLEW112M-6-120N.M×2

Climbing speedm/min

0.5

Counterweightt

26

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

95

Power supply requirement (KVA)

255KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V  260A

Rated working voltage & current

380V  146A

 

Images of TC7034 Tower Crane

 

 

FAQ of TC7034 Tower Crane     

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade


Q:What do you think of this?A teenage boy giving a girl 1000 paper cranes to show his love for her, despite the fact that she previously said she just wanted to be friends. They are 14. He just wants to prove it to her that he is unlike any other boy.
paper cranes take me about 3 minutes to make, that means he took 50 hours making them, wich means he spent 2 whole days folding non-stop... that isn't enough to make a lasting impression, even for a 14yr. old.
Q:It is my contention that God could be held accountable, at least as an accessory, for any crime. God had knowledge of these events in advance and did nothing.
God is not a fallen man that He needs to defend Himself, who is there who can accuse God other than proud mistaken fools?
Q:What is the Tower crane Roadb track laying criteria?????????
The okorder ) track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
Q:You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
these cranes are self raising. as they need to go higher they raise themselves up on hydraulic jacks and another section is bolted in the gap that is left. i hope this will answer your question
Q:Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
Kung Fu Crane Stance
Q:What prior education and skills are needed to become a Crane operator ?
A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
Q:Hi! I'm only going into 9th grade, but I'm getting a head start on chooising a college. I am absaloutley positive I want to be a musician. Hopefully a singer/songwriter, but my plan B is music production. So, I'm going to put Juliard aside (lol)and here are my choices right now:Crane School of Music,Fredonia School of Music,and Berklee School of Musicplease give me your opinion on those schools, and if you could suggest any others, please do. I need all the information I can get...Ive been doing alot of research but now I need other people's opinions. thanks :)
Forgive me, but as far as I am concerned, rap is noise, not music. It may not be offered as a course because some other people also feel that it is noise rather than music.
Q:So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
You string them in combination in order that they nest in combination in a protracted garland, after which fold the garland smartly in a field. It might definitely be ok to ship them--in particular for the period of a excursion for decorations-- despite the fact that the special location you might ship it might differ from location to location. I might additionally advise drawing near the media, your loved ones, peers and colleagues and asking them to sponsor cranes, in order that you're sending cash at the side of your thousand cranes. I'm folding cranes for charity. You can sponsor one for 5 greenbacks. Would do the trick, and it might upload to a symbolic gesture.
Q:How come you never see cranes being transported from one site to another?
They are, the big pieces are moved at times of very low traffic. The huge cranes that build skyscrapers are made up of many small pieces, and the main tower is actually part of the building, not the crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords