• 12 Tons TC6036 Tower Crane H3/36B High Quality System 1
  • 12 Tons TC6036 Tower Crane H3/36B High Quality System 2
  • 12 Tons TC6036 Tower Crane H3/36B High Quality System 3
12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 12 tons

  • Max. Lifting Height: 213.7 m

  • Place of Origin:  China (Mainland)

  • Brand Name: CNBM

  • Model Number: H3/36B

  • Certification: ISO9001, CE Certificate, GOST Certificate

  • After-sales Service Provided: Engineers available to service machinery overseas

 

 

Main Features

 

1) TC6036 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Product Picture

 

12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

 

Parameter list

12 Tons TC6036 Tower Crane H3/36B High Quality

 

 

Packaging & Shipping

 

All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.

 

Service


----Providing timely delivery, standby engineers are ready to slove any of your problem

----Providing all-embraced warranty of products quality, worksite installation guidance

----Providing ample spare parts and training of operation and maintenance

----Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

 

Q: If a friend folded a thousand paper cranes for you what would you think?
that they must have a lot of time:)god bless
Q: As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
Sometimes the structure of the crane is built onto using the crane itself, building itself into a box. Then the crane lifts itself to the higher level. This can be done many times.
Q: 3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
If it's still valid all you need to do is get a duplicate from the agency that issued it.
Q: i need help with my essay,Question: Analyze the poem om terms of its structure, its themes, and its imagery. If youre stuck on themes consider God's absence indifference of nature, or the inronies of war. What is ironic about the poem? How does Crane criticize the romantic hero?
War Is Kind Analysis
Q: how can we minimize energy losses of a crane to reduce the impact on the environment?
No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
Q: We had a very large tree removed from beside our house. The crane parked in the driveway and caused four very large depressions and crushed concrete.
Your insurance won't pay for this. They may help you sue the company you hired. Their insurance should pay for the repairs.
Q: What are the safety devices for tower cranes?
Safety device for tower crane(1) lifting moment limiter, tower crane in lifting objects, the lifting radius and weight of the crane product is a constant number. According to this principle, a lifting torque limiter has been developed, the main function is to prevent overloading of the safety devices. The moment limiter only acts as a protection against the overload torque in the vertical vertical plane of the tower crane arm, and can not protect the tilting accidents caused by oblique hanging, wind load, rail inclination or collapse, etc..(2) weight limiter weight limiter's role is to protect the goods lifting weight does not exceed the maximum allowable weight of tower crane, tower crane is used to prevent the load exceeds the maximum rated load, avoid mechanical damage accident.
Q: I will soon have folded my 1000th paper crane. What should I do with them after I am done?
We okorder /
Q: I'm researching Stephen Crane for an English project and I need to how Stephen Crane's works effected others. Thanks for the help! xP
I'd mention his book Red Badge of Courage and how it changed the war novel for American and English writers. You can look at books like Catch-22 , MASH, or Hemingway's war novels and find that personal voice that Crane used.
Q: What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords