• TC7034 Tower Crane Price for Sale with CE ISO Certificate System 1
  • TC7034 Tower Crane Price for Sale with CE ISO Certificate System 2
TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of TC7034 Tower Crane Price for Sale with CE ISO Certificate

1, TC7034  have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7034 tower cranes are famous for their large operating ranges, varied working methods and wide uses.   

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TC7034 Tower Crane Price for Sale with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

TC7034 Tower Crane Price for Sale with CE ISO Certificate Images

TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

Tower crane Specifiction TC7034 Tower Crane Price for Sale with CE ISO Certificate

TC7034 Tower Crane Price for Sale with CE ISO Certificate

FAQ of TC7034 Tower Crane Price for Sale with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: How to calculate the pouring and maintenance of tower crane concrete in valuation?
Fixed price can be fixed. According to the design of construction organization. For a fixed item, reflected in engineering construction scheme.List price of the project, the quotation, measures, fees, quotations.
Q: What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
Great propoerty, amazing views, cool breezes, near airport. Fantastic restaurants. I'd recommend hiring a car.
Q: What special operators should be equipped for the installation and disassembly of tower cranes?
2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q: I would like to buy KATO crane and I have its serial number. I wonder how I can check with serial number if the crane is Originally Made in Japan! Which site should I go for checking? It will be great help if you answer my question.
I Googled KATO cranes and found several sites. Im sure there is one that can lead you to contact information w/ the company. I happen to be a self proclaimed BEST hyd. crane operator in the states. having logged several years experience. IF you need an operator for hyd. or static line. achd73 at yahoo TonytheTiger
Q: I need it for my English class, not to cheat, but because my literature book only has an excerpt, in which I didn't even know Yukiko's name. And my teacher insists on finding it out for ourselves and I just want to know what the story is about and what the scandal repeatedly implied in the excerpt is.
It's been a while, but I believe the story is about a young girl who gets cancer, and sets about making 1,000 paper cranes for good luck, but she never made to completion. Just google to find info, or see if you can download the book.
Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q: I'm into urban exploration and basically the one thing I haven't done is climb a crane. I don't actually know where one is that I could climb, but I definitely will do it someday. I'm just wondering how illegal it would be? Also, don't give me any it's not safe bull, I'm perfectly confident in my abilities and ready to accept the consequences if I get caught.
Here comes Chuck again with his everlasting wisdom. Heres Chuck:Climbing a crane is illegal. I love guns, and law and order!! My politics lean to the right. blah blah blah. Climbing a crane would be AWESOME. You should do it. videotape it, and post it on youtube for all to see.
Q: It got me thinking.
I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
Q: I can't seem to find the item I'm looking for on-line. Maybe some fellow crane operator happens to know where I can find this. It's a quick releasing crane hook, it drops the load on cue. I think it would probably be remote-controlled.
What load rating are you looking for? I am familiar with heavy lift cranes and smaller ones that do not have any sort of release device that you are looking for. Most rated crane hooks have to be qualified to carry that load and any quick release feature could fail, dropping the load. Maybe you could find such a hook for a non-industrial application, but I have never seen anything like this in use.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords