Tower Crane Mast Section Size 2M*2M*3M QTZ315
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7135
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 3.7~18.26 | 20 | 22 | 24 | 26 | 28 | 30 | 32 |
4 Falls (t) | 16 | 14.48 | 13.02 | 11.8 | 10.77 | 9.89 | 9.12 | 8.45 |
R | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
4 Falls (t) | 7.86 | 7.34 | 6.87 | 6.44 | 6.06 | 5.71 | 5.39 | 5.1 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
4 Falls (t) | 4.84 | 4.59 | 4.36 | 4.15 | 3.95 | 3.76 | 3.59 | 3.43 |
R | 66 | 68 | 70 | |||||
4 Falls (t) | 3.28 | 3.14 | 3 |
71m jib length:
R | 4.7~35.36 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
2 Falls (t) | 8 | 7.98 | 7.38 | 6.96 | 6.58 | 6.24 | 5.93 | 5.64 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
2 Falls (t) | 5.37 | 5.13 | 4.9 | 4.7 | 4.5 | 4.32 | 4.15 | 3.99 |
R | 66 | 68 | 70 | 71 | ||||
2 Falls (t) | 3.84 | 3.7 | 3.56 | 3.5 |
65 m jib length:
R | 3.7~19.55 | 21 | 23 | 25 | 27 | 29 | 31 | 33 |
4 Falls (t) | 16 | 14.79 | 13.36 | 12.16 | 11.15 | 10.27 | 9.5 | 8.83 |
R | 35 | 37 | 39 | 41 | 43 | 45 | 47 | 49 |
4 Falls (t) | 8.24 | 7.7 | 7.23 | 6.8 | 6.41 | 6.05 | 5.73 | 5.43 |
R | 51 | 53 | 55 | 57 | 59 | 61 | 63 | 65 |
4 Falls (t) | 5.15 | 4.9 | 4.66 | 4.44 | 4.24 | 4.05 | 3.96 | 3.7 |
65m jib length:
R | 4.7~38 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
2 Falls (t) | 8 | 7.77 | 7.35 | 6.96 | 6.61 | 6.29 | 5.99 | 5.72 |
R | 53 | 55 | 57 | 59 | 61 | 63 | 65 | 66 |
2 Falls (t) | 5.47 | 5.23 | 5.02 | 4.81 | 4.62 | 4.45 | 4.28 | 4.2 |
60m jib length:
R | 3.7~21.45 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
4 Falls (t) | 16 | 15.57 | 14.13 | 12.93 | 11.89 | 10.99 | 10.2 | 9.51 |
R | 36 | 38 | 40 | 42 | 44 | 46 | 48 | 50 |
4 Falls (t) | 8.89 | 8.34 | 7.84 | 7.4 | 6.99 | 6.61 | 6.27 | 5.96 |
R | 52 | 54 | 56 | 58 | 60 | |||
4 Falls (t) | 5.67 | 5.4 | 5.15 | 4.92 | 4.7 |
60m jib length:
R | 4.7~41.9 | 44 | 46 | 48 | 50 | 52 | 54 | 56 |
2 Falls (t) | 8 | 7.58 | 7.21 | 6.87 | 6.56 | 6.27 | 6 | 5.75 |
R | 58 | 60 | 61 | |||||
2 Falls (t) | 5.52 | 5.3 | 5.2 |
55m jib length:
R | 3.7~21.54 | 23 | 25 | 27 | 29 | 31 | 33 | 35 |
4 Falls (t) | 16 | 14.89 | 13.57 | 12.45 | 11.48 | 10.63 | 9.89 | 9.24 |
R | 37 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
4 Falls (t) | 8.65 | 8.13 | 7.65 | 7.22 | 6.83 | 6.47 | 6.14 | 5.84 |
R | 53 | 55 | ||||||
4 Falls (t) | 5.56 | 5.3 |
55m jib length:
R | 4.7~41.6 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | 56 |
2 Falls (t) | 8 | 7.71 | 7.33 | 6.98 | 6.65 | 6.35 | 6.08 | 5.82 | 5.7 |
50m jib length:
R | 3.7~22.4 | 24 | 26 | 28 | 30 | 32 | 34 | 36 |
4 Falls (t) | 16 | 14.85 | 13.58 | 12.5 | 11.56 | 10.74 | 10.011 | 9.37 |
R | 38 | 40 | 42 | 44 | 46 | 48 | 50 | |
4 Falls (t) | 8.79 | 8.27 | 7.8 | 7.38 | 6.99 | 6.63 | 6.3 |
50m jib length:
R | 4.7~43.6 | 44 | 46 | 48 | 50 | 51 |
2 Falls (t) | 8 | 7.92 | 7.53 | 7.18 | 6.85 | 6.7 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: If a friend folded a thousand paper cranes for you what would you think?
- that they must have a lot of time:)god bless
- Q: Recently a pair of Demoiselle Crane had a chick, it was al healthy right from the very beginning, its parents used to feed him/her a regular diet which usually consisted of insects and worms, it is almost a 30 days old however since yesterday he is not standing or walking on its own legs but just sitting on the knees
- Your baby crane might have stepped on something, But this is nothing like malnutrition, From what ive learned the crane may have a joint dysfunction in the knee but this very common in cranes, I really think you should take an X-ray of the cranes legs because,(and the baby cranes feet will expand over time) This could get worse. This is more than likely a leg dysfunction. Hope this helps.
- Q: I wanna get my gf this nice necklace but I suck at the crane games. Is there a way to cheat?
- a partial cheat that i use is 1st looking to see which items are at least open enough to get 2nd when i start up i get to the item then to go the left and right of item and adjust which way i go then try to aim for the middle of the item wanted then there is an 80 % chance that i will get the item i am aiming for but some of those crane games are rigged to the point you have to go at least 2 or 3 times depending on what type items are on there because the crane arm looses strength especially if it is far away from the exit hole
- Q: What are the safety devices for the horizontal arm self lifting tower cranes?
- (3) the amplitude limiting device shall be equipped with a minimum amplitude limiter and a device for preventing the boom of the boom from rebounding after the luffing of the jib. The trolley must be equipped with a trolley switch and a terminal buffer. (4) rail clamping device and walking limit device; track type tower crane must be equipped with rail clamping device. A walking limit device shall be installed at the same time. (5) a crane with wind point at the root of the boom with a height of more than 50m shall be equipped with an anemometer at the top.
- Q: Whats does the japanese crane symbolize?
- The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
- Q: The earthing resistance of tower crane shall not be greater than that of the tower crane
- Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
- Q: Military Action movie with bunch of cranes at the end?
- Cranes like construction equipment or Cranes like the birds?
- Q: mobile tower etc (uk)
- Tower cranes and Gantry Cranes Since toer cranes are the most used in the construction industry gantry Cranes are used in all Ports for loading and unloading containers has a vast scope of work
- Q: crane operator?
- Category: Cars Transportation Your 'question': crane operator? Possible answers that come to mind. Yes. No. They exist. And my personal favorite, WHAT is your question, and how does it connect to cars and transportation?
- Q: Which one is a better investment? I can get both for 200dollars
- Probably an engine crane (engine hoist). Engine support you still need to lift the engine for the engine support. You hardly ever need to maneuver the engine to do a timing belt. Edit: I have one of the portable lifts what some refer to as a cherry picker. I've never had the need for an engine support.
Send your message to us
Tower Crane Mast Section Size 2M*2M*3M QTZ315
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords