• Tower Crane QTZ100 Panel Mast Section New System 1
  • Tower Crane QTZ100 Panel Mast Section New System 2
  • Tower Crane QTZ100 Panel Mast Section New System 3
  • Tower Crane QTZ100 Panel Mast Section New System 4
  • Tower Crane QTZ100 Panel Mast Section New System 5
  • Tower Crane QTZ100 Panel Mast Section New System 6
Tower Crane QTZ100 Panel Mast Section New

Tower Crane QTZ100 Panel Mast Section New

Ref Price:
$30,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
8T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.4T
Span:
60M
Rated Load Moment:
100T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6014(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 Tower Crane TC6014 Panel Mast Section 8 Ton

Tower Crane TC6014 Panel Mast Section 8 Ton

Tower Crane TC6014 Panel Mast Section 8 Ton


 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Q:ok, how do you make a paper crane. i've totally tried with a direction and marked paper, but that didn't work out. by the time i gave up the paper was all smooth cuz it was so worn. anything would help, links, step-by-step instructions, both. whatever. 10 pts to whoever tells me, and i succeed. sweet
wow, you must be refering to origami I can not help with this one but you can go to the library tomorrow and look it up (NOTE: this is neither joke or riddle see if there is a more appropriate place for this like arts and crafts )
Q:I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
Q:Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
Q:how to make an simple electromagnetic crane?
Not sure what your question is. Do you know how to make an electromagnet, along with a circuit to turn it on and off? Do you know how to make a crane? It might be easiest to use a fishing pole, and hang an electromagnet off it (with a switch on the handle of the fishing rod). Apart from that, it's hard to know which part of the problem you're having trouble with.
Q:i need some links where to buy batteries for the JG 614 preferably 9.6 i just do not like airsoft megastore thank you everyone
Crane okorder / I don't really like the crane stock batteries only because they are a mess to put into the gun and taking them out is only a bit better. If you're not a spray-and-prayer, a small nunchuck/butterfly battery would do just fine.
Q:I looking for information on the surname Crane.?
The meaning of the surname CRANE is - dweller at the sign of the crane; one who lived near the crane river in England; a tall, thin man with long legs.
Q:As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
Sometimes the structure of the crane is built onto using the crane itself, building itself into a box. Then the crane lifts itself to the higher level. This can be done many times.
Q:I read Maggie: A Girl of the Streets in eleventh grade and I wonder if the author, Stephen Crane, was the same Stephen Crane that married Lana Turner.
hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
Q:Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
so trueee!
Q:science project
cranes are usually a system of cables and pulleys.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords