Tower Crane Hoist Motor Heavy Equipment Dealer
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 1.4-8T Rated Lifting Moment: 100KN.M Max. Lifting Load: 8T
Max. Lifting Height: 200M Span: 2.5-60M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC6014(QTZ100) Certification: ISO,CE
Warranty: 1 Year Free standing height (M): 46 Max. Working Range(M):60
Tip Lifting Weight(T): 1.4 Working Range(M): 48,54,60 Climbing speed(M/MIN): 0.5
Counterweight(T): 17.0 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:1600*1600*3000
Main Features of Tower Crane
1. TC6014(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 60m, TC6014(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Hoisting mechanism fitted with three speed moto stable braking and less shock when shifting.
6. Slewing mechanism equipped with 4-speed moto stable and reliable can provide stepless speed regulation.
7. Trolleying mechanism can provide two operatation speeds.
8. With scientific layout and beautiful appearance.
9.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
10.After sales service will be offered which will get rid of all your worries in the purchase of our product
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: I work in downtown Atlanta, and they are doing some kind of work on top of one of the high rise buildings downtown with a big crane. I was wondering how they got that heavy of a crane there to begin with? Thanks ahead of time!
- The tower crane is build on sections of steel structures from ground level, they build much higher than needed, so the protuding section at the top that houses the crane do not need to be removed all the times, that probably explains the cost of building. They probably start to remove the protuding section when it reaches a height which is easy for machinery to access.
- Q: I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- It okorder and view some of the product guides and review the performance data and load charts. It also depends on what type of support soil or foundation that is capable of supporting the crane.
- Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
- You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
- Q: would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
- wow. im helpful anybody tried it!! why : the recommendations co-ordinates the strikes of the finished physique. fairly the arms and the ft, so once you're turning your appropriate foot in clockwise path, with the help of drawing 6 jointly with your hand, that's an ANTI-CLOCKWISE circulate, the recommendations then makes the foot circulate anti-clockwise. Thats how suitable GOD made us!!
- Q: Are there influence about Microwave and electromagnetic waves on the tower crane?
- if the spread is just in the microwave communications channel or radio transmitting antenna in the vicinity, will be subjected to microwave and high-frequency electromagnetic waves Interference, even if it is in all the tower crane hook when the closing power is outage
- Q: I saw a picture of a oragami crane ring that was made out of money on a website but it diddint have any instructions on how to make it. I can already make the regular ring, but i would really like to try to make the crane ring does anyone know of any website that has instructions on how to make it??
- I web-searched and found a picture which cited a Yahoo group as a source of further information. The group does *not* have an open archive. If you're interested in other money-fold projects, you may wish to consider joining that group. I'm listing a link for the group below.
- Q: how long do i have to work as a yardhand in oilfeild to become a crane operator?
- You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
- Q: I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
- The Capitol is a government that rules through absolute control. They're keeping the different areas under control through force, and everybody is too afraid of being killed to stand up to them. The Hunger Games are there to make people afraid of revolting and to give them some hope of one day becoming famous. Crane got killed because he allowed Katniss and Peeta to beat the game. The point of the Hunger Games is that there can only be one victor, but Katniss let them both live. By doing that, she showed that the Capitol couldn't control everyone absolutely, and they could beat the Capitol if they tried. Crane got killed because he let that happen. It also drives home to the reader how brutal Snow can be, and how willing to throw away a life he is.
- Q: Or would it be better to custom order for my applications?
- 1. Crane did not go out of business although they were on shaky ground a year and a half ago. A group of private investors and corporations baled them out. Howard's, Crower Comp are all pretty equal. Your car has roller hydraulic lifters so you'd better know what you're buying. Your missing some Chevrolet factory roller lifters and roller cam grinds. I see you haven't purchased the 2010 GM Performance Parts Catalog from your Chevrolet dealer parts counter yet. It's loaded with mild to wild hydraulic roller small block cams. You haven't figured it out yeat have you? A cam switch isn't going to make that 305 run worth a hill of beans. You need a set of cylinder heads to alow it to breathe first. Remember the EQ 3045A vortec performance heads for your 305? The valves ports are bigger and shaped for higher velosity. You're so stubborn I know you'll buy a cam first and whine like hell cause the car won't run any better. You'd better give this project a lot of thought because you're stuck with the stock intake and fuel/air mixer. Lower rear end gears such as 3.42's or 3.73's will wake the car up. Do that first and see if you want to spend any more money on it.
- Q: for example: erection, technical data...
- Well now Slartybardfast may be tried lol but he is correct give him the points lol.
Send your message to us
Tower Crane Hoist Motor Heavy Equipment Dealer
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords