• Tower Crane  ConstructionEquipment Building Machinery Distributor Sales System 1
  • Tower Crane  ConstructionEquipment Building Machinery Distributor Sales System 2
  • Tower Crane  ConstructionEquipment Building Machinery Distributor Sales System 3
  • Tower Crane  ConstructionEquipment Building Machinery Distributor Sales System 4
  • Tower Crane  ConstructionEquipment Building Machinery Distributor Sales System 5
Tower Crane  ConstructionEquipment Building Machinery Distributor Sales

Tower Crane ConstructionEquipment Building Machinery Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane  ConstructionEquipment Building Machinery Distributor Sales

Tower Crane  ConstructionEquipment Building Machinery Distributor Sales

Tower Crane TC7135 Technical Sheet:

Tower Crane  ConstructionEquipment Building Machinery Distributor Sales

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.





 


Q:What functions should be achieved in mechanical structure design?
The design of mechanical structure is based on the overall design, according to the principle of the program to determine and draw a specific structure, in order to reflect the required functions. Is the working principle of the abstract concrete into some parts, the specific content in determining the structure of the material, shape, size, tolerance, heat treatment and surface conditions at the same time, we must consider the process, strength, stiffness, accuracy, and other parts of the relationship between each other and other issues. So, the direct product structure design is the technical drawings, but the design work is not a simple mechanical drawing, drawing only express design language, specific integrated technology is the basic content of structural design.
Q:What are the sectors of machine building and parts processing?
1., industry generally refers to its production of similar products, or with the same process, or to provide similar labor services division of economic activities, categories.
Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
Q:What are the world famous mechanical equipment exhibition?
1, the German BMW Exhibition (BAUMA) sponsored by: Messe M nchen GmbH, held every three years, has held 30 sessions, the thirty-first will be in April 2016 11-17 in the German city of Munich exhibition centre. The German international engineering machinery, building materials machinery, mining machinery, construction vehicles and Equipment Expo is the world's largest and most influential international engineering machinery, building materials machinery, mining machinery industry exhibition, every three years regularly held in Munich in germany. The fair combines science and technology, trade, information and technical cooperation
Q:What are the mechanical drawing software?
The 3D map only contact with SolidWords and Pro/E, Pro/E is better than Solidwords in general, but Solidwords is very simple to use, see Help tutorials you can learn to draw a three-dimensional map is not particularly complex easily to estimate a few days is enough. But any one of the two kinds of software, want to do not understand the words, expert advice is not really easy. UG and MasterCAM haven't touched much, but I've heard that it's suitable for processing stereogram.
Q:Mechanical bearings, all types? Roughly
The most representative rolling bearings, widely used, can bear radial load and two-way axial load. For high speed and low noise, low vibration occasions with steel dust cover or seal type bearing rubber sealing ring in pre filled with the appropriate amount of grease, the outer ring stopper bearing ring or flange, namely axial positioning, and easy to install in the housing. The size of the maximum load type bearing is the same as that of the standard bearing, but there is a loading groove in the inner and outer rings, which increases the number of balls loaded and improves the rated load.
Q:Construction Engineering, moving equipment and stationary equipment, respectively
2. Static equipment: reaction equipment (code R). Such as reactor, reaction kettle, decomposition pot, polymerizer, autoclave, converter, digester, steam ball, sulfonation pot, gas producer and so on. Heat exchange equipment (code H). Such as tubular waste heat boiler, heat exchanger, evaporator, condenser, cooler, heater, sterilization pot, water jacket, etc. for dyeing dryer, steamer, cooker, gas preheating. Separation equipment (code S)
Q:What are the principles, performances and uses of the commonly used construction machinery equipment?
2.: Principle: loader loader work, powered by a flywheel of the diesel engine to the hydraulic torque converter, the torque converter will drive to the gearbox, and before and after the output flange of the gearbox, the power output of the gearbox after the transmission shaft are respectively transmitted to the front and back drive axle to drive the wheels forward. Performance: 1) Central articulated frame, turning radius is small, flexible and convenient operation in narrow space; 2) using hydraulic mechanical transmission, according to the size of the external resistance and automatic stepless speed change, which can make full use of engine power, and improve the maneuverability, simplifies the loader operation. Is to protect the transmission parts and engine; 3) adopts full hydraulic steering, power shift transmission, hydraulic or flexible manipulation, portable and flexible machine; 4) stable and reliable operation; wide use of low-pressure off-road tires, rear axle swing, with good cross-country performance and through the performance by 5); gas cap oil disc brake system and brake foot up, emergency braking system, the braking performance is safe and reliable; 6) with advanced structure and bright cab. The air conditioning system operates more comfortably. Uses: loaders are mainly used for shovel, loading, unloading, transport of soil and stone a kind of bulk materials, rock and hard soil can also be slightly shovel operations.
Q:What are the main functions of construction equipment monitoring system?
The total of the console cameras and auxiliary equipment (such as camera, PTZ, shield) control generally adopts the bus mode, a control signal to the camera near the terminal in the terminal box decoding, decoding box will total console from the control signal encoding solution, a control action command signal, a variety of actions to go camera control and auxiliary equipment (such as lens zoom, pan rotation etc.). In the case of some cameras that are close to the control center, in order to save money, the command signal, which is the "on or off" signal, can also be sent directly by the console. In short, according to the composition of the system and requirements, can be considered in order to complete the overall console design requirements or order requirements.
Q:Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords