• Heavy Equipment Dealer Topkit Tower Crane Parts System 1
  • Heavy Equipment Dealer Topkit Tower Crane Parts System 2
  • Heavy Equipment Dealer Topkit Tower Crane Parts System 3
  • Heavy Equipment Dealer Topkit Tower Crane Parts System 4
  • Heavy Equipment Dealer Topkit Tower Crane Parts System 5
  • Heavy Equipment Dealer Topkit Tower Crane Parts System 6
Heavy Equipment Dealer Topkit Tower Crane Parts

Heavy Equipment Dealer Topkit Tower Crane Parts

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Heavy Equipment Dealer Topkit Tower Crane Parts:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Heavy Equipment Dealer Topkit Tower Crane Parts:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Heavy Equipment Dealer Topkit Tower Crane Parts:


ItemParameter
Free standing height (m)50.5
Max height with attachment (m)200
Working range can be adjusted(m) 48/54/60
Min working range(m) 2.5
Max lifting capacity(t)10
Tip load @ 60m(t)2.4
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-56
MotorYZPBE132S-4-5.5KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTW112M-4-5.5KW×2
Climbing speed(m/min)0.5
Counterweight(t)48m jib 54m jib60m jib
15.4517.8518.9
Mast section size(L×W×H)mm2000×2000×3000
Working temperature-40-+60°C
Total power(KW)63
Cable type ( within 35 meters from site power source to lower electric box of tower crane )50mm2(3+2, 5 cores)
Startup voltage & current380V×95%=361V       219A
Rated working voltage & current380V/121A


Heavy Equipment Dealer Topkit Tower Crane PartsHeavy Equipment Dealer Topkit Tower Crane PartsHeavy Equipment Dealer Topkit Tower Crane Parts

Heavy Equipment Dealer Topkit Tower Crane Parts

Heavy Equipment Dealer Topkit Tower Crane Parts


Heavy Equipment Dealer Topkit Tower Crane Parts

FAQ Heavy Equipment Dealer Topkit Tower Crane Parts;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: please tell me thats not what i think it is O_O
It probably is what you think. I've heard that they use whale parts to make some brands of lipstick so I wouldn't be surprised if they used parts of other animals in cosmetics. =X
Q: What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...
Q: The judge that sentenced people Death or Exile looked alot like Dr. Crane in the 1995 Batman film, which is why I ask.
Yes Gordon even calls him crane i remember
Q: Is there a certain direction and reason a construction worker will leave a crane facing a certain direction.
I don't think there is a particular direction unless prevailing winds are a factor. Here in Las Vegas, cranes, when idle don't seem to have a pattern. At least from what I have seen.
Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
Ever heard of Superman?
Q: What is the Tower crane Roadb track laying criteria?????????
The okorder ) track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
Q: All these birds are bigger than wild turkey and can fly long distances.
Not answerable as you do not indicate in what area you are considering, weight, wingspan, height? Even in weight it is controversial. The mute swan and Andean Condor weigh in at around 30 pounds. In height it would be the Crane. And wingspan would be the Albatross.
Q: I can't find anything about this online, and I've never heard of it before.... I'm looking nearby for a Karate club to join, and came across this.I've heard of white crane kung fu, but not karate...
Wado ryu is a sturdy, low-priced form of karate that comes with many jujitsu journeys and throws in that is sparring, it has slender stances and prefers to steer sparkling of particularly than address warring parties head on like shotokan or goju. Having achieved wado i will propose it. the only white crane i've got achieved is a kung fu gadget from fujian province that's frequently hand innovations and open hand blocks with some low point kicking. i stumbled on wado greater assorted with a reliable grading gadget that's regarded globally. Tatsuo Suzuki of wado is an inspiring guy even in his early 70s.
Q: The crane was commissioned in the plant some 15 yrs back. The cranes is being used for lifting hot metal (iron) from furnace to Pig casting machine since commissioning. Regular maintenance is being done on the same.
no you have to asses the related struturals.
Q: Just curious... I'm not in construction and always wondered...
little pieces by welly chopper

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords