Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting LargePT6015-10T
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PT6015-10T Description
Feature: Tower Crane
Condition: New
Application: All construction
Rated Loading Capacity: 5ton
Rated Lifting Moment: 500KN.m
Max. Lifting Load: 5ton
Max. Lifting Height: 160m
Span: 3~50m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number:PT6015-10T flat top tower crane 5010
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Max.load capacity: 5ton
flat top tower crane Jib length: 50m
Free standing height: 35m
Relay elements: Schneider
Slewing speed: 0.6r/min
Rated hoisting capacity max radius: 1ton
Working temperature: -20~+40
Tower crane Material: Q345B Steel
Trolley speed: 40/20m/min
Tower crane Color: as customers' requirement
PT6015-10T Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Advanced painting process
5. Potain masts designed with dismountable panels, making teansport easier and cheaper.
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
PT6015-10T Specification
PT6015-10T Pictures
PT6015-10T FAQ
Q: What is main advantage for manufacturing construction machinery?
A: Our machinery main advantages mainly include: 1. Nationallevel Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies providing worldwide after-sales service;
Q: What kinds of ur tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane.
Q: What is the meaning of the tower crane’s code?
A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
- Q:which is crane lift planning software free to download?
- autocad based
- Q:If a friend folded a thousand paper cranes for you what would you think?
- If a friend folded even a single crane for me it would be enough.I'd feel lucky for sure.Its the feelings of your friend that counts not Sadako's theory.
- Q:I don't like the cranes that use a wired pulley systems for controlling the camera.The crane will need to carry a 7 pound camcorder.
- Camera okorder /
- Q:What windproof devices should be set up for crane work?
- 4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
- Q:my class is supposed to start reading poems/short stories by Stephen Crane.why should i look forward to his work?
- Well, you know he lived in the late 1800s, so you probably have an idea of what his poetry will sound like. Then you read some of it, and the effect is sort of like walking into what you think is going to be a prissy hair salon and being whacked over the head with a bunch of bananas wielded by a glow-in-the-dark green monkey from Jupiter. Crane's stuff is that weird. And I mean that in a good way.
- Q:What was the mekhane (crane) used for in Greek plays?To remove scenery between actsTo lift the king and his court to their viewing boxFor actors playing the godsIt was only used in building and tearing down the set
- For actors playing the gods. The Greeks loved theatre, and just like today, there were cheap productions with little merit or wothiness for remembrance. In these cheaper plays, the creators would try to appeal to the people's religious convictions by having one of the gods (usually Zeus) descending from heaven to resolve the conflict and set things right. To present this in theatre form, the actor would be lowered down to stage on a crane in order to simulate the god descending from heaven. This became such a tired cliche in ancient Greece that the phrase Deus Ex Machina, which translates to God of the Machine, has come to mean An unexpected, artificial, or improbable character, device, or event introduced suddenly in a work of fiction or drama to resolve a situation or untangle a plot.
- Q:Protected cranes are nesting in pine trees with possible disease carrying bird droppings covering drive way and street where neighborhood children play. I've called several local organizations only to be told there is nothing I can do since they are protected by law. These birds return every year and stay for about 4 months - each year gets worse with droppings and stench. Daily cleaning is required but that still does not keep the areas around them clean.
- Give the U.S. Fish and Wildlife Service a call I'm sure they will help in some way.
- Q:If a crane fly loses a leg will he be okay? Is it painful for him or do they just 'release' them like a lizard can release it's tail?
- Only lizards can release a part of their body, but only the tail. It probably lost its leg while it was flying because it had a string tightly wrapped around it for a long time and it finally just fell off. It would probably hurt them a little because the bloodflow would be cut off and it would be somewhat numb.
- Q:I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
- The Capitol is a government that rules through absolute control. They're keeping the different areas under control through force, and everybody is too afraid of being killed to stand up to them. The Hunger Games are there to make people afraid of revolting and to give them some hope of one day becoming famous. Crane got killed because he allowed Katniss and Peeta to beat the game. The point of the Hunger Games is that there can only be one victor, but Katniss let them both live. By doing that, she showed that the Capitol couldn't control everyone absolutely, and they could beat the Capitol if they tried. Crane got killed because he let that happen. It also drives home to the reader how brutal Snow can be, and how willing to throw away a life he is.
- Q:[tower crane] and [tower crane] what is the difference between, how to distinguish?
- [tower crane] is a professional term, [tower crane] is a saying or abbreviation, also called "tower crane".
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting LargePT6015-10T
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords