Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PT6015-6 Description
Feature: Tower Crane
Condition: New
Application: All construction
Rated Loading Capacity: 5ton
Rated Lifting Moment: 500KN.m
Max. Lifting Load: 5ton
Max. Lifting Height: 160m
Span: 3~50m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number:PT6015-6 flat top tower crane 5010
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Max.load capacity: 5ton
flat top tower crane Jib length: 50m
Free standing height: 35m
Relay elements: Schneider
Slewing speed: 0.6r/min
Rated hoisting capacity max radius: 1ton
Working temperature: -20~+40
Tower crane Material: Q345B Steel
Trolley speed: 40/20m/min
Tower crane Color: as customers' requirement
PT6015-6 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Advanced painting process
5. Potain masts designed with dismountable panels, making teansport easier and cheaper.
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
PT6015-6 Specification
PT6015-6 Pictures
PT6015-6 FAQ
Q: What is the function of the monitor?
A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.
Q: What is the meaning of the tower crane’s code?
A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
- Q: I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
- Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
- Q: science project
- hydraulic
- Q: how do they get the construction crane onto the the tall buildings?
- If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
- Q: I am currently an electrical apprentice but would like to become a crane operator. Something i have always wanted to become. I was wondering what the job market is for a tower crane operator vs a mobile crane operator? Also what is the salary comparison? Also how to get my foot into the door and become one. Thank you!
- You have to be able to do simple trig to figure what your crane is capable of. You will have to become a member of the crane workers union. Someone may have to die to make a space for you. You may have to take jobs that are just fork lift qualified, if you are lucky, you might find work at seaports unloading cargo ships.You may have to work your way up through the ranks as a wrecking ball operator. The very lucky will make 50-60K +. The really good ones will make more only after many years.
- Q: I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
- White Crane Kung Fu combines protection and assault and makes use of the two gentle and not basic power. It additionally emphasizes organization yet evasive footwork. that's an on the spot, linear and deceptive martial paintings. this actual device is named Fei He or Flying Crane. Flying Crane makes use of the two extreme and occasional kicks yet has a marked decision for speedy hand innovations. It stresses empty-hand as properly as weapons preparation, 2-person instruments, self-protection drills and loose-sparring.
- Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
- it climbs the tower as the tower goes higher. the crane has 8 mechanical legs that it lift it self mechanically.like a spider in a tree or as the tower goes higher workers add a piece at the bottom of the crane using hydraulics
- Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
- How Do They Grow? Tower cranes arrive at the construction site on 10 to 12 tractor-trailer rigs. The crew uses a mobile crane to assemble the jib and the machinery section, and places these horizontal members on a 40-foot (12-m) mast that consists of two mast sections. The mobile crane then adds the counterweights. The mast rises from this firm foundation. The mast is a large, triangulated lattice structure, typically 10 feet (3.2 meters) square. The triangulated structure gives the mast the strength to remain upright. To rise to its maximum height, the crane grows itself one mast section at a time! The crew uses a top climber or climbing frame that fits between the slewing unit and the top of the mast. Here's the process: The crew hangs a weight on the jib to balance the counterweight. The crew detaches the slewing unit from the top of the mast. Large hydraulic rams in the top climber push the slewing unit up 20 feet (6 m). The crane operator uses the crane to lift another 20-foot mast section into the gap opened by the climbing frame. Once bolted in place, the crane is 20 feet taller! Once the building is finished and it is time for the crane to come down, the process is reversed -- the crane disassembles its own mast and then smaller cranes disassemble the rest.
- Q: Hi, lately I found out how to make origami cranes. I heard somewhere that there's a charity that you can send in origami cranes and they'll help Japan. Can anyone give me this charity? Or any way to help Japan with origami cranes! Thanks!
- One okorder /
- Q: A crane operator was extended his Tadano crane boom(two section of boom out of five) at almost 0 degree boom angle. My question is-Is it safe to lift any load at 0 degree boom angle.
- I suppose Tadano is the manufacturer and they make several models most of which are safe at zero degrees with two sections extended. The weight of the extended cable and hook need to be added to the weight being lifted or lowered, so the allowable weight could be zero for a very long cable. Some safety factor is present, so you may choose to push your luck. A cable that breaks suddenly can whip around in a dangerous manner. If you bend the boom replacement will be very costly. If the boom was bent in a previous lift, it is much weaker than an unbent boom and the extending feature may jam. Neil
- Q: Calculate the tower crane gantry crane
- It includes electric hoist, big car running mechanism, bridge frame, support leg, electrical equipment and so on. Applicable to station, wharf, warehouse, freight yard, construction site, cement product yard, factory, hydropower station and other outdoor work place, also suitable for indoor workshop work
Send your message to us
Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords