• Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6 System 1
  • Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6 System 2
  • Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6 System 3
Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

PT6015-6  Description

Feature: Tower Crane

Condition: New

Application: All construction

Rated Loading Capacity: 5ton

Rated Lifting Moment: 500KN.m

Max. Lifting Load: 5ton

Max. Lifting Height: 160m

Span: 3~50m

Place of Origin: Shandong, China (Mainland)

Brand Name: MEIDA

Model Number:PT6015-6 flat top tower crane 5010

Certification: ISO,CE,GOST,BV

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Max.load capacity: 5ton

flat top tower crane Jib length: 50m

Free standing height: 35m

Relay elements: Schneider

Slewing speed: 0.6r/min

Rated hoisting capacity max radius: 1ton

Working temperature: -20~+40

Tower crane Material: Q345B Steel

Trolley speed: 40/20m/min

Tower crane Color: as customers' requirement

PT6015-6  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Advanced painting process

5. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

7. Engineers available to service machinery overseas.   

PT6015-6 Specification

 Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6

PT6015-6  Pictures

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-6

PT6015-6  FAQ

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.

 

Q: What is the meaning of the tower crane’s code?

A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q:What is a typical hourly wage, and what kind/how much training is required? Is there a special certificate that you have to get, sort of like a driver's or pilot's license? Does it vary much depending on what type of crane (track crane vs. tower crane)?
Before you can operate a crane, you have to possess a trade certificate from a licensed agency. And before you got one, you have to undergo training and it depends on the extensiveness of the program of a licensed agency. the trade certificate is like a license, it has range of machines which you can operate with once license. Salary differs and it is based on hazards of work. A typical example is the crane operator in construction of Burj Tower. Being on the top of the building is not an easy job so the operator will likely receive salary more than a crane operator who is working in a typical high rise building.
Q:Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.
Q:What is the difference between a crane and a crane in a tower crane?
Informal: hoisting signal worker: refers to the signal flag!Cable man: rope!
Q:What are the safety devices for tower cranes?
(6) the rail clamp is used to clamp the rail, prevent the crane from walking by wind in the strong wind, and cause the tower crane to derail and overturn the accident.(7) the wind meter automatically records the wind speed, and automatically alarms when more than six wind speed is over.(8) the anti stripping device of the steel wire rope is mainly used to prevent the steel wire rope from disengaging from the pulley groove during the transmission process(9) the hook insurance prevents the lifting of the steel wire rope because of the excessive angle or the wrong hook, and causes the lifting wire rope to be broken off and the suspension falling accident.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
If an answer of -4 hours is expected, pl. excuse. The practical difficulties of the faster cranes are constraints - the loading to / unloading from any crane is tricky, time consuming are with practical problems. The ship. yard where it is angered, the type of the cargo also decide the swiftness of unloading ; so it is not simple ratio !
Q:I work in downtown Atlanta, and they are doing some kind of work on top of one of the high rise buildings downtown with a big crane. I was wondering how they got that heavy of a crane there to begin with? Thanks ahead of time!
If they have more than 13 floors, in fact there is a 13th floor. People are just too superstitious for some buildings, like hotels to state them. It will skip from 12-14.
Q:I need to know how Stephen Crane came up with writing the Red Badge of Courage. I need examples of his life experiences that he had and then he put them in the Red Badge of Courage.
i could continuously advise To Kill a Mockingbird. it quite is a large tale and additionally you're able to relish it. Do you purely might desire to verify a form of? by way of fact the extra you examine, the extra constructive arranged you would be. Does your e book on the topic of wellbeing careers might desire to be non-fiction? an astonishing novel a pair of conventional practitioner is slicing for Stone by utilising Abraham Verghese.
Q:I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
Be the crane, be the crane. Seriously, just aim at the biggest item with three openings and try to move the crane to get it. They should let people rotate the crane, but then it would be easy for them to lose money.
Q:A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:hes been here for about 3 years. i want to feed him but i don't know what it eats. is there any way i could help him eat? i think he is going to die if we destroy the last of the forest area where we live.
Want to help? Don’t feed them, which draws them deeper into dangerous urban areas. And try to keep reflective surfaces covered. Following these tips could keep these majestic citizens a little safer. In 2002, the Florida Fish and Wildlife Conservation Commission made it illegal to feed sandhill cranes. Why Is Feeding Cranes A Bad Idea? Cranes fed by humans can become aggressive toward people. In several instances, children have been attacked by cranes. Cranes fed by humans also have been known to damage window screens and do other property damage. This behavior is probably a response of the birds to seeing their reflection, bringing out a territorial defense behavior (scratching at windows or shiny automobiles). Cranes also are more likely to tangle in human garbage in areas populated by people. Cranes attracted to people's yards for feed are put at risk as they walk across roads. Many sandhill cranes are killed each year on Florida roads. Cranes are also more likely to crash into power lines in urban areas where such aerial hazards are concentrated. Attracting cranes to urban areas increases the threat of predation (especially to young cranes) by dogs or cats. Further, the cranes' diets, which normally are quite diverse, are disrupted when they eat one food item (such as corn), consistently. Heavy pesticide use in urban lawns also is of concern. Young sandhill cranes have died from pesticide poisoning. It's Never a Good Idea to Feed Wildlife People inadvertently put cranes in harms way when they attract these birds with feed. Florida sandhill cranes have an abundance of natural foods (insects and small animals) and they do not need handouts from humans. There are many reasons why cranes should not be intentionally fed by humans, so I hope this gives you a few you can communicate to these well-intentioned people. The bottom line message: For the good of the cranes, please do not feed them.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords