Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT8025
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PT8025 Description
Feature: Tower Crane
Condition: New
Application: All construction
Rated Loading Capacity: 5ton
Rated Lifting Moment: 500KN.m
Max. Lifting Load: 5ton
Max. Lifting Height: 160m
Span: 3~50m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number: PT8025 Flat top tower crane 5010
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Max.load capacity: 5ton
flat top tower crane Jib length: 50m
Free standing height: 35m
Relay elements: Schneider
Slewing speed: 0.6r/min
Rated hoisting capacity max radius: 1ton
Working temperature: -20~+40
Tower crane Material: Q345B Steel
Trolley speed: 40/20m/min
Tower crane Color: as customers' requirement
PT8025 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Advanced painting process
5. Potain masts designed with dismountable panels, making teansport easier and cheaper.
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
PT8025 Specification
PT8025 Pictures
PT8025 FAQ
Q: What kinds of ur tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane.
Q: What is the function of the monitor?
A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.
Q: What is main advantage for manufacturing construction machinery?
A: Our machinery main advantages mainly include: 1. Nationallevel Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies providing worldwide after-sales service;
Q: What is the meaning of the tower crane’s code?
A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.
- Q:Who thinks William Shatner is adorable as Denny in Boston Legal? I do!! I just want to pinch his cheeks. He looks so lovable (in a chubby old guy kind of way. Lol.)AhahaAnd Shirley. She's so funny.Lincoln, suck. my. lobe. lol!Anywho...answer my denny question!!
- LOVE him as Denny Crane. He makes me laugh every time!!
- Q:i am making a wired crane robot to pick and drop a wooden block of about 5*5*10cm dimension. I would like to know wat r the different possible lifting mechanisms by which i can lift the wooden block.Ideas other than the normal claw shaped lifters
- There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
- Q:The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
- Sorry the only information on Cranes here is of the Feathered variety, you have entered the wrong section sorry.
- Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
- Standard number: GB/T 5031-2008Standard Name: Tower CraneStandard status: currentAlternatives: instead of GB/T 17806-1999; GB/T 17807-1999; GB/T 5031-1994; GB/T 9462-1999This standard specifies the nomenclature, classification and identification, technical requirements, test methods, inspection rules, information identification, packaging, transportation and storage, installation and climbing, and inspection of tower cranes.
- Q:This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
- try okorder /
- Q:How do you calculate ground bearing pressure for cranes?
- You use statics. You get the specs for the crane and what it is lifting and determine from the site the pick angles and where the outriggers are going to be placed. Then you do the 3-D calcs to determine the reactions necessay and determine the soil's allowable bearing pressure, then design temporary footing based on that.
- Q:I wanted the email address for the cartoonist Pickles by Brian Crane to find that golfing humor comic strip that ran in the newspapers. Maybe this would help. How many strokes do you think? Two - one big drive and a short putt. Now killed the golf ball. Then said Now one heck of a putt! I am still trying to find that comic strip but anyone has the email address, please let me know asap. Thanks!
- P)lease provide me the mailing address for Brian Crane. I desire to mail him a letter in reference to his Pickles comic strip. Thank you!
- Q:Iv done some research and I cant seem to find a place that might sell jibs locally here in Phoenix. Iv been considering the ProAm DVC 200 crane but I would also like to see others in like a store. If anyone has any info it would be appreciated!
- I went down that path last year in the SF Bay Area in California. I could not find a store that carried any cranes or jibs - so I just started asking around. Stay away from any that use cables to keep the stage steady - we used one at a shoot - setting up is an interesting challenge. I thought I wanted the same unit you are looking at - and decided I needed to trust the crane a bit more with my HDR-FX1... I had to wait longer to save more $, but I really like the crane and tripod kit I ended up with... from Kessler Crane... I never got to see it before I bought it and I was, um... nervous... but I am glad I made the investment - and Eric Kessler is REALLY helpful and great to work with. One of the other cranes I looked at uses a heavy duty PA speaker stand as its tripod base. After watching light trees and PA speakers fall over because of leg failure, I could not bring myself to trust them to hold my camcorder. I can STAND or JUMP on the Kessler tripod and it does not budge. It is rock-steady and really strong. The Hercules head is silk-smooth and the crane-arm and camera stage are steady and easy to manipulate. After a little practice, it now takes me about 10-15 minutes from the time I start unpacking until I am ready to start shooting. That includes mounting the camcorder, setting the counterweights, mounting a portable DVD player with AV-in as the monitor mounted to the tripod-head so I can see what the camcorder is shooting and running the AV, headphone and LANC cables and making the whole thing pretty with velcro strips.
- Q:Equipment safety of tower crane
- Some use units over profit, not pay attention to safety, small horse cart, overloading seriously, tower crane accident is one of the main source of high incidence. Some manufacturers in order to meet the construction requirements of the enterprise, expand sales, to occupy the market, will be independent of height increase, the boom will be lengthened to increase the tower coverage, this is bound to reduce the stability of tower crane, reduce the rated lifting weight, increased insecurity. There are some private and unauthorized modification of the tower crane tower crane in the assembly, this part of the tower crane for a long time in the second-hand purchase price is cheap, not willing to invest in maintenance, and frequent failure, which should arouse our attention, we should seek truth from facts, according to local conditions, to solicit the views of all parties on the basis of the introduction of relevant the supporting policies to solve this problem. By strengthening the safety management of several aspects of tower crane, it can effectively prevent all kinds of accidents in the process of tower crane use, and play a preventive role. Practice shows that as long as the construction enterprises, factories, construction administrative departments, in accordance with the tower crane detection institutions can each link to do, to strengthen the safety management of the tower crane, can effectively control the incidence of major accident of crane.
- Q:I need help making a origami crane that can flap his wings.
- These okorder It takes quite a few tries to get it right, but once you do it is easy.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT8025
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords