Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 0.8-4T Rated Lifting Moment:40KN.M Max. Lifting Load: 4T
Max. Lifting Height: 110M Span: 2.25-48M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC4808(QTZ40) Certification: ISO,CE
Warranty: 1 Year Free standing height (M):31.5 Max. Working Range(M): 48
Tip Lifting Weight(T): 0.8 Working Range(M): 38,43,48, Climbing speed(M/MIN): 0.4
Counterweight(T): 7.6 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:1400*1400*2000
Main Features of Tower Crane
1. TC4808(QTZ40) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808(QTZ40) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
7. Trolleying mechanism can provide two operation speeds.
8. With scientific layout and beautiful appearance.
9.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
10.After sales service will be offered which will get rid of all your worries in the purchase of our products
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
- Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
- Q:I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
- Seneca Crane is the previous Game Master, the one that was killed for letting Katniss and Peeta live. She hung the dummy in the training session to make a statement about the Capitol having him killed and replaced.
- Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
- Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
- Q:What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
- Henry begins the book as an idealistic and completely self-absorbed teenager who wants nothing more than a chance to show off and be thought of as a brave and daring male. From Shmoop
- Q:A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q:Old used 200 t crawler crane is available for purchase. What are the guidelines/ thumb rules for assessing its cost ?
- Supply vs demand Extreme examples: If the crane is no longer needed anywhere, the cost will be 0; no demand. If the crane still has a unique useable function and there is only one available, it's immediate cost will be very high; no supply. So, assuming that the cranes supply/demand is somewhere in the middle, the methodology for assessing it's cost would be to evaluate the following: * Where is it located with respect to where it is needed? (place value) * How quickly do I need it, and how quickly can I get the crane? (time value) * What alternative solutions are available? * How much do other similar cranes cost? * etc Hope this helps!
- Q:What are the main parameters of a tower crane?
- For car luffing tower cranes, the maximum lifting height is only related to the height of the tower, and when the height of the tower is determined, the maximum height of the ceiling is a certain value.In addition to the 4 major performance parameters. And the working speed (including lifting speed, rotary speed and walking speed of car, traction speed), an important parameter gauge, wheelbase, total power, motor structure weight, balance and gross weight, etc.. These important parameters often determine the tower crane selection, such as speed of operation often determines the number of selected cranes, motor power requirements of power supply load, gauge, wheelbase of the site, and the structure weight, balance weight, weight of the foundation treatment of heavy machine requirement.Tower crane (tower crane) is called tower crane, also known as tower crane. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. The tower crane consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
- Q:Hey, can someone let me know some more about the support cable on the top of most cranes. Eg. material, what different types are out there etc. Thanks
- its called wire rope. Cables are for electricity and TV.
- Q:So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
- Well I don't think u have anything to feel bad about. Does everyone need to be treated like some kid of a hero because they have cancer? I think that is stupid. With all the people in the world everyone is gonna dislike someone. A ***** is a ***** no matter what disease she may have. After you fold 1000 cranes I think you are supposed to make a wish. Now if you wished that there was something that would remove her from your class, then I would feel guilty.But other than that I don't think you have anything to feel bad about. Or if you were really hard on her too but don't think that jut because she has cancer that she can be a ***** and everyone has to worship her. That is just bullshit. If she gives **** than she must be prepared to take ****. And as for giving them to her, I think it would be a nice gesture, but just think about it. What would you do if someone gave u a thousand paper birds? I think very few people would keep them. Now I don't know if you are supposed to give them away, but if you are, I think you should ive them to someone who means something to you personally and not because they have a disease. It is human nature to not like someone and just because they have cancer it shouldn't change that unless this experience has made them a better person and all that **** that you always hear about. But I don't think you have anything to feel bad about and not liking a teacher is completely normal. Please e-mail me your thoughts on this.
- Q:All types of jack up cranes. How is the maximum lifting torque converted?
- Tower crane lifting torque = crane maximum lifting weight * maximum operating range; for example: the maximum lifting weight is 2T*, the maximum operating range of 50 meters =1000KN.m.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane Building Equipments in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords