Tower Crane New Building Machine in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC7034 Description
Feature: Tower Crane Condition: New Application: Construction Max.Lifting Load: 12T Max Tip Load:3.4T Independent Height:50M
Max Lifting Height: 200M Span: 70m Certification: CE,ISO
Place of Origin: China(Mainland) Model Number: TC7034
Packaging & Delivery of Tower Crane TC7034
Packaging Detail: Nude package Delivery Detail: 25-30days
Main Feature of Tower Crane TC7034
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC7034 Specifiction
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Tower crane 5610 why is it called QTZ63?
- Strictly speaking, 5610 should be called TC5610;At present in the domestic type mark in two ways: one is QTZ++, one is TC++, for example, such as QTZ80, Q is the first letter of Chinese "play", T is the first letter of Chinese "tower", Z is the Chinese "from" the first letter is self lifting tower crane 80, the unit is 80 tons of tons of rice, rice is a concept called lifting torque, rated torque, maximum rated product weight and maximum range; as in the 13.4 meters lift 6 tons, the product is 80 tons of rice;Such as: TC6010, T is the English TOWER, C English CRANE, TC tower crane is English shorthand, the 60 refers to the jib 60 meters long, 10 refers to the boom in the front 60 meters lift 1 tons, and TC5513 refers to the boom length of 55 meters, the front suspension of 1.3 tons. TC tagging is an international universal annotation. Domestic commonly used models areQTZ series: 40, 63, 80, 100, 125, 160,200, 250, 315
- Q: for my homework : the question was explain how a skyscraper crane uses physics moments but no where can i find out the answer and dont want a detention ekkk x
- OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
- Q: I had a dream and it wos really scary so realistic i woke up crying and could go to work the next dayi was in my house and woke up and came downstairs and there were letters on the floor and someone was picking them up then i looked outside and there wos a big fire and a crane had fallen down and explosion and everyone was dying their faces burnt i burst out crying. what does it mean?
- Probably some stress or fear is looming large in your subconscious mind. Scary dreams often occur when you have something that is stressing you. That is assuming you didn't read some book or watch some movie that brought it on, that is another possibility. Often we replay images we have in our heads from the day before. I don't think it is an omen or anything. So, be glad to say it was only a dream.
- Q: I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
- Large okorder .
- Q: I don't really believe that the wish will be granted.Anyways I've really been into Origami and I remember reading in my Heroes book (slash the show) that a certain number of cranes means a wish. But before I start making all these cranes, I want to know if it's 100 or 1,000.So if you haven't gotten it in your head yet the question is:Is it 100 or 1,000 cranes to get a wish
- 1000 Cranes Wish
- Q: I have to create a crane to support a dead load for my Engineering Technology class. It can be made out of only 1/8 inch balsa wood and wood glue, and is going to be graded by the ration of weight held to structure weight.Could anybody give me some suggestions as to how to go about designing this thing? I already know most of the basics, but if anybody could give me some specific tips, they would be greatly appreciated.Thanks!
- Not enough information because a crane can be many shapes and have various forms of anchoring or counterbalancing the load. If you are not allowed to anchor to a base and can't use weight to counter the load (if all balsa) then you have to create legs and lift the load between them - Basically the design will need to be triangles in truss to take the compression and prevent twisting and a long upper piece in tension to act like the cable you don't have. I would make two legs that are each 3 sided trusses that meet at the top and have a single rod across the bottom to keep them from spreading. Then I would make a longish beam with flat triangles for stiffness and use a few uprights to position the tension rod. Hang the weight on one end and push down on the other so it pivots on the short legs.
- Q: sun/rising/etcBQ: how often are your winnings
- I definitely have a 17 12 months-old that gets my sponsorship for any a variety of machines that crosses our direction. he's sturdy. We shop what we'd like and supply something to newborn's charities.
- Q: The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
- of course its not realistic but it looked great, i just dnt know how they can jump from tht high and land on the other cranes and buildings. james bond was a bit clumsy in tht scene, i reckon tht other black fella was way beta at park-coring
- Q: for example: erection, technical data...
- www.okorder
- Q: Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
- Crane Fireball Ignition
Send your message to us
Tower Crane New Building Machine in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords