Tower Crane 10 Ton Mechanism VFD Technical Control
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6016(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6016
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 1.6 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-4KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight(t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 60 | |||||||
Power supply requirement (KVA) | 190KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
380V×95%=361V 210A | ||||||||
Rated working voltage & current | 380V 116A | |||||||
Loading diagram:
60m jib length:
R | 2.5-22.4 | 30 | 40 | 50 | 60 | ||
a=2 (kg) | 5000 | 3646 | 2630 | 2014 | 1600 | ||
R | 2.5-11.245 | 20 | 30 | 40 | 50 | 60 | |
a=4 (kg) | 10000 | 5564 | 3573 | 2560 | 1944 | 1530 | |
54m jib length:
R | 2.5-24.55 | 30 | 40 | 50 | 54 | |
a=2 (kg) | 5000 | 4028 | 2919 | 2246 | 2046 | |
2.5-12.36 | 20 | 30 | 40 | 50 | 54 | |
a=4 (kg) | 10000 | 6130 | 3958 | 2849 | 2176 | 1976 |
48m jib length:
R | 2.5-25.69 | 30 | 40 | 48 | |
a=2 (kg) | 5000 | 4232 | 3073 | 2488 | |
2.5-12.96 | 20 | 30 | 40 | 48 | |
a=4 (kg) | 10000 | 6431 | 4162 | 3003 | 2418 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: What windproof devices should be set up for crane work?
- 4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
- Q: Tower crane driver simulation exam which website?
- The driver of the tower exam is nothing more than the operation and safety of knowledge.
- Q: Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
- 1/5 + 1/x = 1/3 == x = 15/2 = 7.5 h answer : 7.5 hours ++++++++++++++++++++
- Q: i need some links where to buy batteries for the JG 614 preferably 9.6 i just do not like airsoft megastore thank you everyone
- Crane okorder / I don't really like the crane stock batteries only because they are a mess to put into the gun and taking them out is only a bit better. If you're not a spray-and-prayer, a small nunchuck/butterfly battery would do just fine.
- Q: It`s like a big box filled with toys and u insert a coin and then u have 2 handle the small crane to pick up a toy...
- There is one version called the Grab-O-Matic, and it is on sale at www.LeapsandBounds for $20.95, usually $34.95.
- Q: what is the crane track base ?
- Mechanical or birds?
- Q: Yea i need to write up a summary on that short story, but SERIOUSLY dont have time to read it because i have to study ever sentence to understand things lol.
- The Open Boat Summary
- Q: I ve read about crane flies and many experts say they do not bite nor sting. Ifor that is the case, what is the little piece of their abdomen that looks like a stinger?
- It's an ovipositor. The thing goes under bark and lays their eggs there.
- Q: A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
- The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
- Q: We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
- Depends on the building of course. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.
Send your message to us
Tower Crane 10 Ton Mechanism VFD Technical Control
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords