Tower Crane 10 Ton Mechanism VFD in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6016(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6016
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 1.6 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-4KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight(t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 60 | |||||||
Power supply requirement (KVA) | 190KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
380V×95%=361V 210A | ||||||||
Rated working voltage & current | 380V 116A | |||||||
Loading diagram:
60m jib length:
R | 2.5-22.4 | 30 | 40 | 50 | 60 | ||
a=2 (kg) | 5000 | 3646 | 2630 | 2014 | 1600 | ||
R | 2.5-11.245 | 20 | 30 | 40 | 50 | 60 | |
a=4 (kg) | 10000 | 5564 | 3573 | 2560 | 1944 | 1530 | |
54m jib length:
R | 2.5-24.55 | 30 | 40 | 50 | 54 | |
a=2 (kg) | 5000 | 4028 | 2919 | 2246 | 2046 | |
2.5-12.36 | 20 | 30 | 40 | 50 | 54 | |
a=4 (kg) | 10000 | 6130 | 3958 | 2849 | 2176 | 1976 |
48m jib length:
R | 2.5-25.69 | 30 | 40 | 48 | |
a=2 (kg) | 5000 | 4232 | 3073 | 2488 | |
2.5-12.96 | 20 | 30 | 40 | 48 | |
a=4 (kg) | 10000 | 6431 | 4162 | 3003 | 2418 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I know it sounds like a silly question but I just wanted to know what kind of crane he is because I've never seen a crane with black feathers.
- Red-crowned Crane is a large crane and is the second rarest crane in the world. In East Asia, it is known as a symbol of luck and fidelity
- Q:Please, if their is a site that shows how to build a crane, provide a link. btw: i do not want to buy some sort of crane building kit.Thanks
- Step by step: 1. Get male crane 2. Get female crane 3. Play romantic music 4. Wait 31 days 5. Voila! you have made a crane!
- Q:What does "automatic tower crane" mean less than 100 tons per metre?
- The problem is a bit ambiguous, 100 tons of rice is the lifting moment.
- Q:I know, do you know?
- They build it on the ground, raise it up with another crane, and then lift the counter weights up!
- Q:why are siberian cranes endangered?
- Wetland loss means Siberian Crane loses ground Siberian Crane Grus leucogeranus is now listed as Critically Endangered, having previously been listed as Endangered in 1994. Its population is estimated to be 2,500-3,000 and comprises three separate populations. The western population breeds in western Siberia and winters in Iran, and the central population breeds in western Siberia and winters in India. Both the western and central populations are on the verge of extinction as a result of habitat loss and hunting. The much larger eastern population breeds in eastern Siberia and winters in the lower Yangtze basin in south-east China. The main threats to this population are wetland destruction and degradation at staging areas and wintering sites caused by agricultural development and the development of oil fields. The main wintering site in China, Poyang Lake in Jiangxi Province, holds 95% of the global population but is potentially threatened by future hydrological changes resulting from the construction of the Three Gorges Dam and other dams. If the operation of these dams prevents the development of suitable winter feeding conditions for waterbirds at Poyang Lake and other wetlands, Siberian Crane and other threatened species could undergo extremely rapid population declines in the near future.
- Q:What tower cranes are used on the 30 storey house?
- but if the building steel structure more parts or building the number of square meters more than 60 thousand square meters, you need to consider QTZ80 or more of the tower crane, because the type of large lifting capacity is big, the work efficiency is high. Hope to be of help to you!
- Q:don't its wheel provide the same amount of friction?
- To make it harder for them to tip over.
- Q:i was wondering
- it would be better if you tried it. :P Ive never heard the story but this is actually wishing magick. so I would vote true on it, but i think there are better wishing methods that won't require that much time and won't kill trees. Blessings, Shadow
- Q:How come you never see cranes being transported from one site to another?
- Many are too large to be transported whole, and are assembled on-site (or even build for a single on-site use).
- Q:because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
- Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane 10 Ton Mechanism VFD in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords