• Tower Crane New VFD Technical Control for Sale System 1
  • Tower Crane New VFD Technical Control for Sale System 2
  • Tower Crane New VFD Technical Control for Sale System 3
  • Tower Crane New VFD Technical Control for Sale System 4
Tower Crane New VFD Technical Control for Sale

Tower Crane New VFD Technical Control for Sale

Ref Price:
$40,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Structure of Tower Crane TC6016 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 10T                            

Max Tip Load:1.6T                          

Independent Height:50.5M

Max Lifting Height: 200M                      

Span: 60m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC6016         

 

Packaging & Delivery of Tower Crane TC6016


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC6016


 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC6016 Specifiction


Free standing height (m)

50.5

Max height with attachment (m)

200

Working range can be adjustedm

485460

Min working rangem

2.5

Max lifting capacityt

10

Tip load @ 60mt

1.6

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132S-4-5.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-4KW×2

Climbing speedm/min

0.5

Counterweightt

48m jib  

54m jib

60m jib

15.45

17.85

18.9

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

60

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      210A

Rated working voltage & current

380V                 116A

 

 Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q: Is it to do with visibility?What are some other colours of cranes?
Here is NZ they are normally yellow
Q: What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q: how do they make those tall cranes so TALL?
with a taller crane. Some are over 600 feet tall.
Q: for my homework : the question was explain how a skyscraper crane uses physics moments but no where can i find out the answer and dont want a detention ekkk x
OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
Q: Calculate how much power the crane has?
the crane ?? The crane is not defined.
Q: I heard on the TV and found it hard to believe. I mean, they are soooo goddamned stupid and dont look like they could muster up the intelligence to bite someone anyway. Also my pet rat catches them and eats them when they blunder into the house and he seems fine! On TV it said they were one of the most poisonous creatures of their species! Should my bullsh1tometer be off the charts?
The same program showed that the fangs were too small to puncture human or other mammals' skins. They have the poison, but can't deliver it to bigger creatures, sort of like North Korea.
Q: The earthing resistance of tower crane shall not be greater than that of the tower crane
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q: i know there is a lot of styles in the crane and the praying mantis and ba gua. then what types are there? and what is the most powerful one??
Well... you seem to have two questions in here. First of all, the crane and praying mantis are both stances used in internal (Weija) and external (Neija) Wing-Chun (Kung-fu). Second, Bagua is one of the internal styles. External styles are more powerful for fighting styles.
Q: What are the requirements for jack up and plus section of jack up tower crane?
Ask you experts on the construction site of self lifting tower cranes how to install?. Is it like lifting a jack up of a car jack and hanging it in the middle when it's empty?
Q: I am kinda really sick of paper cranes, and I was wondering if there's any good method of making paper birds that look, well, like birds. I checked out the one website with instructions, but, well, look at it. I tried it.
I haven't made the other birds on this site but they have a pelican and an owl. I think the pelican looks a bit crane-ish but it may look different in reality. Have fun!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords