• Tower Crane TC6016(QTZ100) Building Hoist System 1
  • Tower Crane TC6016(QTZ100) Building Hoist System 2
  • Tower Crane TC6016(QTZ100) Building Hoist System 3
  • Tower Crane TC6016(QTZ100) Building Hoist System 4
  • Tower Crane TC6016(QTZ100) Building Hoist System 5
  • Tower Crane TC6016(QTZ100) Building Hoist System 6
Tower Crane TC6016(QTZ100) Building Hoist

Tower Crane TC6016(QTZ100) Building Hoist

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1.6-10T     Rated Lifting Moment:100KN.M           Max. Lifting Load: 10T

Max. Lifting Height: 200M           Span: 2.5-60M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC6016(QTZ100)           Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):50.5          Max. Working Range(M): 60

Tip Lifting Weight(T): 1.6          Working Range(M):48,54,60              Climbing speed(M/MIN): 0.5

Counterweight(T): 18.9              Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:2000*2000*3000             


Main Features of Tower Crane


1. TC6016(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 60m, TC6016(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

5. Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable.

 

6. Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.


7. With scientific layout and beautiful appearance.

 

8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

9.After sales service will be offered which will get rid of all your worries in the purchase of our product


Specification of Tower Crane

 

Tower Crane TC6016(QTZ100) Building Hoist


Tower Crane TC6016(QTZ100) Building Hoist

Tower Crane TC6016(QTZ100) Building Hoist


Images of Tower Crane


Tower Crane TC6016(QTZ100) Building Hoist

Tower Crane TC6016(QTZ100) Building Hoist

Tower Crane TC6016(QTZ100) Building Hoist

Tower Crane TC6016(QTZ100) Building Hoist

Tower Crane TC6016(QTZ100) Building Hoist


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q: ...the crate weighs 4000N when resting on the ground. Find the followinga)The tension in the cable necessary to do thisb)The work done by the cablec)The work done by gravityd)The total work done by the systeme)The final velocity of the crate
Ghee is clarified butter! The rest sounds like homework!
Q: Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
You wouldn't need a crane, all you'd need is a hershey's bar and she'd wattle off the yoga mat. Or, you can present her with facts about the destruction of her e-mail server, the fact that she allowed innocent people in Iraq and Syria to die, or the fact that she hit the reset button with Russia, and she'll RUN AWAY from the yoga mat.
Q: type of dc motors used by electric train/subway,crane & fan.give a brief explanation to your answer?
I believe that electric trains and subways use series motors when DC motors are used because the series motor has a torque vs. speed curve that provides high torque at low speed and low torque at high speed. Since power is equal to torque times speed, that is essentially a constant power mode of operation. I believe that mode is selected because it results in a smaller and less expensive complement of power delivery equipment and more efficient operation. Although it has been many years since DC motors were used extensively for cranes, I believe that series motors were used more than other types for the same reasons stated above. However, compound or separately excited motors may have been used for better speed and torque control at low speeds. Except for heater fans in vehicles, I don't believe DC motors have ever been used much for fans. Today, permanent magnet DC motors are used for all of the little motors in vehicles including the radiator fan that was formerly belt driven by the engine. A permanent magnet motor is like a separately excited motor or a shunt motor. The optimum DC motor for a fan would probably be a shunt motor because a fan requires increasing torque as speed increases. Today, computers are cooled by brushless DC motors.
Q: How do we build an ELECTROMAGNETIC crane?
The bible does mention the pyramids. It is in Exodus when the Jews have been in captivity in Egypt and developed them. What? You suggestion the Egyptians had the skill or science to do it? The secret is that they were built from the highest down as a substitute than the bottom up.
Q: Do cranes, the bird, have any significance in Egyptian or Chinese mythology?
A crane is considered auspicious in China. It is one of the symbols of longevity and is often represented with other symbols of long life, such as pine, bamboo, and the tortoise. Also, traditional Chinese 'heavenly cranes' (tian-he) or 'blessed cranes' (xian-he) were messengers of wisdom. Legendary Taoist sages were transported between heavenly worlds on the backs of cranes.
Q: How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q: What are the conditions of tower cranes, strictly prohibited?
According to the national standard "tower crane safety regulations" (GB5144-2006) requirements, "the installation and disassembly, section, or drop section operation, wind tower crane at the maximum installation height should be no more than 13m/s, when there are special requirements, according to user and manufacturer's protocol implementation." Wind speed 13m/s, that is, 6 winds.
Q: What prior education and skills are needed to become a Crane operator ?
idk
Q: Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
The name of QTZ is the former mechanical standard, Q refers to the crane, T refers to the tower, Z is to indicate the self lifting, and the latter figure represents the nominal torque, the unit is T.M (the standard unit is KN.m)The type of "QTZ63" indicates the hoisting tower crane with nominal lifting torque up to 630KN.m;The type of "QTZ80" indicates the hoisting tower crane with nominal lifting torque up to 800KN.m;
Q: The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords