Tower Crane 10 Ton TC6016 QTZ100 in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6016(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6016
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 1.6 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-4KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight(t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 60 | |||||||
Power supply requirement (KVA) | 190KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
380V×95%=361V 210A | ||||||||
Rated working voltage & current | 380V 116A | |||||||
Loading diagram:
60m jib length:
R | 2.5-22.4 | 30 | 40 | 50 | 60 | ||
a=2 (kg) | 5000 | 3646 | 2630 | 2014 | 1600 | ||
R | 2.5-11.245 | 20 | 30 | 40 | 50 | 60 | |
a=4 (kg) | 10000 | 5564 | 3573 | 2560 | 1944 | 1530 | |
54m jib length:
R | 2.5-24.55 | 30 | 40 | 50 | 54 | |
a=2 (kg) | 5000 | 4028 | 2919 | 2246 | 2046 | |
2.5-12.36 | 20 | 30 | 40 | 50 | 54 | |
a=4 (kg) | 10000 | 6130 | 3958 | 2849 | 2176 | 1976 |
48m jib length:
R | 2.5-25.69 | 30 | 40 | 48 | |
a=2 (kg) | 5000 | 4232 | 3073 | 2488 | |
2.5-12.96 | 20 | 30 | 40 | 48 | |
a=4 (kg) | 10000 | 6431 | 4162 | 3003 | 2418 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechanical engg., design engg. and others (plz. specify) ?
- Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
- Q:I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
- In the end of the first book, he was put in a room with a bowl in the middle. In the bowl, there were berries. Very deadly berries. This is significant because in the arena, Peeta and Katniss threatened the Capitol that they would eat them and kill themselves. If that happened, there would be no victor. President Snow wanted Seneca Crane to kill them. But Seneca Crane let there be two victors, instead of one or none. So, back to the point. Seneca Crane was punished because he couldn't listen to the president's orders. So, he was put in a room with no food, water, etc. If he got hungry he, he had to eat the berries. So, he died. I don't know how you missed that, but I hope this helps! :) I LUV U PEETA!
- Q:How would the environment, habitat, or ecosystem be affected if whooping cranes were extinct?
- the whopoping crane is not a part of the food chain. Nothing would happen. 100 birds is not a pencil point in the data. We spend millions on this bird and it's lose would NOT be noticed by anyone. I'll bet not one person on this form has even seen one, can tell us what is food chain function is. A link to a post or wikpedia won't cut it either, I want the exact species that is in the chain both up and down and what the exact effect would be. Since no one can give a specific chapter and versus on the specifics and talk about genaerizations, IMHO, I'm correct. NOW If the question was about the loss of all Raptors in the world, there would be an upset. The Whooping crane in it's self is so small it's impact of lose is zero. I call BS on the poster that says she saw them in FL. NOT ONE SINGLE WEB site lists FL as it's home range. You could at least have gone to Wiki and gotten your facts right and answered my AP question, but you instead tried a red herring act to promote your bias. PS I've been to the AP and know all about them (clue tell us what I meant here and prove you are a player on this subject)
- Q:I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
- Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
- Q:HSE Officers can better answer this question or a qualified Crane operator it self can explain.
- each crane is so different. it depends on the rated crane load, the lifted distance from the crane and actuall load to be lifted. Each crane an envelope of angles to the horizontal, lifted load, and distance from the crane. The crane operator must insure that he is within this envelope or the crane may topple over. Also, the wind at the time of the lift must be considered. If you can picture a seesaw with loads pivoting about a fulcrum. When two people are on the seesaw, one person is the crane and the other is the load to be lifted. Only in the case of a crane, the fulcrum is at the crane itself with a large dead load counter weight behind the cab operator.
- Q:i have to make a children's story about how the whooping crane became endangered; (based on real facts) ideas?
- You could write a story about an old Whooping Crane with lots of children that goes on migration only to come back and find her home has been destroyed. So she goes and starts trying to raise awareness about it, and eventually finds a new home due to her efforts. This would need much more tweaking and changing of course.
- Q:Who would win a fight between a Whooping Crane and a chinchilla?
- Chinchilla. They have powerful teeth, dense fur (for armor) and they are very fast. A whooping crane has very fragile bones, and when birds are cut they tend to bleed uncontrolably. They crane could simply fly away if it was uninjured, but by running away it means the chinchilla has won.
- Q:Was it Ichabod Crane or Rory Emerald who got the jeepers creepers scared out of them by a headless horseman?
- ichabod crane but he also got his head cut off by the horse man so im sure it was him pluss he was the main charachter
- Q:Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
- Kung Fu Crane Stance
- Q:How come you never see cranes being transported from one site to another?
- They are, the big pieces are moved at times of very low traffic. The huge cranes that build skyscrapers are made up of many small pieces, and the main tower is actually part of the building, not the crane.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane 10 Ton TC6016 QTZ100 in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords