• Topkit Cranes Rental Tower Crane Specification System 1
  • Topkit Cranes Rental Tower Crane Specification System 2
  • Topkit Cranes Rental Tower Crane Specification System 3
  • Topkit Cranes Rental Tower Crane Specification System 4
  • Topkit Cranes Rental Tower Crane Specification System 5
  • Topkit Cranes Rental Tower Crane Specification System 6
Topkit Cranes Rental Tower Crane Specification

Topkit Cranes Rental Tower Crane Specification

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Topkit Cranes Rental Tower Crane Specification


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Topkit Cranes Rental Tower Crane Specification


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Topkit Cranes Rental Tower Crane Specification


ItemParameter
Free standing height (m)50
Max height with attachment (m)200
Working range can be adjusted(m) 50/55/60/65/70
Min working range(m) 2.5
Max lifting capacity(t)20
Tip load @ 70m(t)5
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-50-100-100-20
Speed(m/min)0-800-400-400-20
MotorYZPBF280S-4-75KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-60
MotorYPBE132M-4-11KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTRVF 132M2-4-9KW×3
Climbing speed(m/min)0.45
Counterweight(t)25
Mast section size(L×W×H)mm2450×2450×5000/2500×2590×6000
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)115
Rated working voltage & current380V/273A

Topkit Cranes Rental Tower Crane SpecificationTopkit Cranes Rental Tower Crane SpecificationTopkit Cranes Rental Tower Crane SpecificationTopkit Cranes Rental Tower Crane Specification

Topkit Cranes Rental Tower Crane Specification


Topkit Cranes Rental Tower Crane Specification

FAQ Topkit Cranes Rental Tower Crane Specification

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:I caught this crane fly in my garage but is almost the size of a dragonfly. It has a 3 inch wingspan. I saved it in a jar because I though no one would believe me. so do they really get this big or is this thing a freak?
Giant okorder /
Q:Grade 4 build a working crane Help!?
I would use about a 2 foot piece of broomstick pinned through a hole in one end. Maybe 2 to 3 inches away, a larger clearance hole with a 1/4-20 nut glued under. Use a lo-o-ong 1/4-20 bolt as a driver. (1/4-20 is 1/4 inch diameter with 20 threads per inch.) I leave the mounts and string up to you as to encourage your participation and creativity.
Q:how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q:im really curious about the 1000 paper crane legend. i went on many different websites to learn about it. one said that you are supposed to have 25 strings to hold the paper cranes (40 each) on it and is that true? also a lot websites said that they used them for weddings so do you have to use them for weddings? or can it be any wish you want? i have a few more questions about it but i will ask whoever seems to know the most about it. thank you:)
Most people give paper cranes to their love ones who are ill. Since it is a tedious job, they will all help each other in folding it. Shalbi I may be wrong, but I know that to be able to make a wish, you have to fold the cranes yourself. The wish can be anything, but the most common wish is to recover from sickness and have a prosperous life. A crane signifies longevity and fidelity that is why they like to use them on weddings. ^_^
Q:What is the fundamental differences between Goju-ryu Karate and Fujian White Crane?
Actually, to discredit Big Bill, the differences are scant. There are a collection of YouTube videos from Morio Higaonna's time spent in China doing a demonstration with white Crane artists. A lot of the differences are superficial. Hell, one form demonstrated by the White Crane guys started off like a Tomari Te kata, Wankan. There's also a video of Morio, Gushi( Pangai Noon/ Uechi Ryu), and two Chinese masters doing Saam Chim in comparison with Sanchin.
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
TC6013A-6-A2:TC is the abbreviation of tower crane, and 6013 is crane lifting moment, which means that 60 meters long arm tip can lift 1.3 tons. A says Model 6 means lifting capacity of 6 tons. "A2" means code.
Q:How the cranes can stand without any tipping with huge counter weights on its back? If there is no suspended load also the crane is is still stable with huge counter weights on its back. How it can possible? Why crane is not offballencing while we adding extra counter weights on it without any suspended load?
Usually the counterweights can move back and forth on an arm. They are moved toward the crane when there is no load and away from the crane when there is a load. If the counterweights can't move, then the crane must be designed to hold (at least) the minimum counterweights in their fixed location. As the crane gets loaded, the net moment decreases, and then increases in the other direction as more and more load gets added. It is still likely that the maximum design moment when loaded far exceeds the moment due to the counterweights on an unloaded crane.
Q:Tower cranes should stop working when the wind speed is greater than the magnitude.
Rules for safety regulation of tower crane,The installation of tower crane is strictly prohibited at grade 4 or above
Q:cover up? I know he was into pornography and who knows what else!
Like George Reeves -- who is officially a suicide there are rumors but no convictions.
Q:I only wish to know about Tower Cranes, not any other type of crane. Also only wish to know about cranes on the job, not sitting in a crane yard. I am an operator and looking to move and want to know where the work is best so a list of top five would be terrific. Thanks.
We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords