Customise New Rental Types of Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our Customise New Rental Types of Tower Crane
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our Customise New Rental Types of Tower Crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our Customise New Rental Types of Tower Crane
Item | Parameter | ||||
Independent height (m) | 46 | ||||
Max height with attachment (m) | 138(200) | ||||
Working range can be adjusted(m) | 48/54/60 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 60m(t) | 1.4 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFC250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 53/27/12 | |||
Motor | YZTDE132L-4/8/16 3.3/2.2/1.1KW | ||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 17.0 | ||||
Mast section size(L×W×H)mm | 1600×1600×3000 | ||||
Working temperature | -40-+60°C | ||||
Total power(KW) | 42 | ||||
Power supply requirement(KVA) | 190KVA for generator | ||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A | ||||
FAQ Customise New Rental Types of Tower Crane
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: OMG! a phoba of crane flys, and there are 5 on my celling right now!!! What do I do, will the move and fly around eventually? I can't kill them, they are out of my reach, and if they start moving, im runing the %^$ outta my house.Will they die by tommorow? or will they just hang there?
- Just gently scoop them up in your hand and put them outside.They don't bite!
- Q: What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
- The okorder /
- Q: Probably my favorite of the jumping kicks I practice, and I'm curious what experiences you guys have had with it. I've caught people of guard with it after using a crescent or roundhouse kick in kickboxing, and I've done it with a knee to the chest then the kick to the head in Muay Thai. I've also practiced the ten foot kick (using the initial foot up to propel yourself forward instead of up) and crossed the ring to the opponent before they could move. What are your thoughts? What kind of variations do you practice? Ever had any good/bad results from it?
- Every technique has its purpose. If you have favorites, you are limiting yourself by putting more emphasis on one thing over the other.
- Q: Why do you think children all over the world still fold paper cranes and send them to Hiroshima? Please answer c:
- I think children send them from all over the world because of what she did and they were inspired by her i guess 0o. ( 1000 paper cranes it hard to make and annoying lol)
- Q: How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
- with other cranes and lift systems. When done, they move on to the next project.
- Q: Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
- With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
- Q: i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
- It might be that specific company or something. I'm on the Las Vegas strip right now, and there are dozens of cranes pointed every which way.
- Q: I have to read this book for an AP class next year. I did read the book and i don't understand how i can discuss the setting and its possible relationship to the theme. I looked stuff up on the internet and I've asked other people who have read the book and they're just as confused as I am. I need help!
- I can't tell you what to write or what you see as the theme but one of the themes in the book is man versus nature. Maybe you could discuss the setting as part of nature and what Crane seems to be saying about it. One thing that might help is a poem Crane wrote which explains how he sees things. Maybe you already know it. It's titled A man said to the universe A man said to the universe, Sir, I exist! However, replied the universe the fact has not created in me a sense of obligation. An indifferent universe. Not unlike how Thomas Hardy saw things.
- Q: how do they erect those large tower cranes you see on big building projects?
- with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place
Send your message to us
Customise New Rental Types of Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords