Timber Beam Formwork for Column and Wall and Slab Construction
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Durable formwork H20 timber beam for support
1.Diameter of inner tube: 40mm,48mm,etc.
2.Diameter of outer tube: 48m,56mm,60mm etc.
3.Wall thickness:1.6mm,1.7mm,1.8mm,2mm etc.
4.Adjustable length:heavy duty 1800-3200mm,2100-3400mm,2200-3900mm ,
2200-4000mm,3000-5000mm,3500-4000mm etc.
light duty 1600-3000mm,1800-3500mm,2000-3500mm etc.
5.Base plate:120*120*4mm/4.5mm/5mm,150*150*6mm
6.Shape of base plate:flower or square
7.Surface : paint,hot dipped galvanized,pre-galvanized,electrical galvanized
8.Type:with hands cup or open thread
9.OEM service is available
10.Package:in bundle or in bulk
Heavy duty prop
MIN | MAX | Inner tube | Outer tube |
1.8m | 3.2m | 48*2.0mm | 60*2.0mm |
2.1m | 3.4m | 48*2.0mm | 60*2.0mm |
2.2m | 4.0m | 48*2.0mm | 60*2.0mm |
2.4m | 3.9m | 48*2.0mm | 60*2.0mm |
3.5m | 4.0m | 48*2.0mm | 60*2.0mm |
3.0m | 5.0m | 48*2.0mm | 60*2.0mm |
Light duty prop
MIN | MAX | Inner tube | Outer tube |
1.6m | 3.0m | 40*2.0mm | 48*2.0mm |
48*2.0mm | 56*2.0mm | ||
1.8m | 3.5m | 40*2.0mm | 48*2.0mm |
48*2.0mm | 56*2.0mm | ||
2.0m | 3.5m | 40*2.0mm | 48*2.0mm |
48*2.0mm | 56*2.0mm |
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Advantages and disadvantages of climbing frame and floor type scaffoldPjal | browse 5789Recommended 2016-09-21 09:11:21 best answerClimbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. But it also has the disadvantage of fixed structure.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Send your message to us
Timber Beam Formwork for Column and Wall and Slab Construction
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords