• TC6520 Tower Crane with Tower Head with CE ISO Certificate System 1
  • TC6520 Tower Crane with Tower Head with CE ISO Certificate System 2
TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of TC6520 Tower Crane with Tower Head with CE ISO Certificate

1,TC 6520 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 65m, TC 6520 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TC6520 Tower Crane with Tower Head with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

Tower crane Specifiction TC6520 Tower Crane with Tower Head with CE ISO Certificate

TC6520 Tower Crane with Tower Head with CE ISO Certificate

FAQ of TC6520 Tower Crane with Tower Head with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: can somebody give me good info on this. its a martial art im very interested in leaning and i would like some background info on it first thx
There are several different kinds of Crane Kung Fu. There is the Fujian White Crane Kung Fu and there is the Shaolin Crane Kung Fu, just to name two. I like Crane Style Kung Fu because it is a graceful style that relieves stress.
Q: What do you do to become a crane operator, do you go to school and how long is it?
OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
Q: Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q: What are the parts of a tower crane? What are their main functions?
The tower crane is mainly composed of a tower body, door frame, tower, tower cap, boom, arm and other metal structure and balance hoisting, luffing, slewing mechanism operation, composition and electrical system and safety device etc.!
Q: Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
Q: The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q: He is one of my favorite poets. I want to read more of his work.
How about my favorite poem about Hart Crane? AT HART CRANE’S TOMB by Glenn Robert Swetman In his mind’s dark, he spoke a frivolous age where marriage of the like was spring, where vitelline worlds of virgin instinct were crushed in the obscene cleanliness of a raccoon’s paw. Did he imagine that his great sun could come trailing yellow handkerchiefs of light, like a queer comet? No, there is something out there that commands, and not worlds of perfect clipping will turn these rotund hedges into maypoles—and live. That’s why the green expands as it reaches. He must have seen this finally. His leap Into the green sea was, aesthetically, clean.
Q: Form the movie Dreamer, daughter of Ben Crane
This Site Might Help You. RE: Who is Cale Crane? Form the movie Dreamer, daughter of Ben Crane
Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Agency level lifting mechanism: M5 luffing mechanism: the maximum working range of M4 working range: 56m minimum generation writers instead of me...... Thanks...... 6T tower crane CAD diagram
Q: a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
The work done (W)= Force*Distance. Force is 9.81*3000kg. So W = 9.81*3000*8.5 = 250,155 J Power (P)= Work(W)/Time(t) = 250,155/15 = 16,677 W 60% efficiency means that the lift is only using 60% of its maximum amount of power output. So to find 100% (lets call it x) of the crane's efficiency, consider the following: x * 0.6 = 16,677 x = 16,677 / 0.6 = 27,795 W Total mechanical energy in a system remains constant, so the kinetic energy the moment it hits the ground equals the potential energy when it is still hanging in the air. Potential energy = mgh = 3000x9.81x8.5 = 250,155 J You know this is correct, because it is the same amount of work the crane performed on the object to lift it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords