• TC5610 6T Verified Tower Crane with CE ISO Certificate System 1
  • TC5610 6T Verified Tower Crane with CE ISO Certificate System 2
  • TC5610 6T Verified Tower Crane with CE ISO Certificate System 3
  • TC5610 6T Verified Tower Crane with CE ISO Certificate System 4
  • TC5610 6T Verified Tower Crane with CE ISO Certificate System 5
  • TC5610 6T Verified Tower Crane with CE ISO Certificate System 6
TC5610 6T Verified Tower Crane with CE ISO Certificate

TC5610 6T Verified Tower Crane with CE ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our TC5610 6T Verified Tower Crane with CE ISO Certificate


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC5610 6T Verified Tower Crane with CE ISO Certificate


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC5610 6T Verified Tower Crane with CE ISO Certificate

Independent height (m)

41.5

Max height with attachment (m)

141.5

Working range can be adjusted(m) 

44/50/56

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.5

-

3

3

-

6

Speed(m/min)

0

-

80

0

-

40

Motor

YZRDWF225M2-4/8 -24/24KW     

Trolleying mechanism

Speed(m/min)

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YZR132M2-6-3.7KW X2

Climbing speed(m/min)

0.58

Counterweight(t)

14.1

Mast section size(L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

37

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   108A

 

TC5610 6T Verified Tower Crane with CE ISO CertificateTC5610 6T Verified Tower Crane with CE ISO CertificateTC5610 6T Verified Tower Crane with CE ISO CertificateTC5610 6T Verified Tower Crane with CE ISO Certificate

TC5610 6T Verified Tower Crane with CE ISO Certificate


TC5610 6T Verified Tower Crane with CE ISO Certificate

FAQ Topkit Cranes Rental Tower Crane Specification

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: How to calculate the pouring and maintenance of tower crane concrete in valuation?
Fixed price can be fixed. According to the design of construction organization. For a fixed item, reflected in engineering construction scheme.List price of the project, the quotation, measures, fees, quotations.
Q: I need the answer badly
The world would be a little less beautiful. The blue crane's role as a predator in its ecosystem would be left empty, allowing its former prey to breed without check until (hopefully) another predator moves in to pick up the slack. Otherwise the ecosystem will be out of balance.
Q: Can someone find me a map that shows the geographic location of the white naped crane?
www.okorder /
Q: anyone can tell me the common steel tube material using for crane boom, both main chord and lattice boom. thanks !
Most aerial cranes (Erickson Skycrane) are used for tasks such as remote location work or expedious work. It takes awhile to erect a crane for one air conditioner unit to be replaced on top of a 5 story building or to replace a cable on a wire bridge. They are also widely used for fire supression.
Q: Do large semi-submersible crane vessels such as the SSCV Thialf propel themselves to work sites or are they carried on heavy-lift ships. I understand they have propulsion systems but the just seem so bulky, inefficient, and slow to move across oceans on their own.
Very large capacity crane vessels have propulsion machinery for manoeuvring when on station. The most modern designs of semi-submersible vessel use them to achieve 'dynamic positioning'. Older designs used the propulsion systems to assist when deploying the anchors in the correct pattern. The vessels are towed by tugs when making deep sea passages. First generation crane vessels had much smaller lifting capacities and were either constructed on conventional hulls or were converted from existing ships. These types were capable of making ocean passages using their own propelling machinery.
Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q: ok, so if chad is a crane then why doesnt he stay in the mansion? he is a crane right?
Yes, Chad is a Crane. He's Alistair's son by Eve's younger adopted sister Liz. I think he doesn't live in the mansion because there's already a gazillion people living there already. How could he stay discreetly on the down low' in a house full of 20 people lol
Q: i need to write a 2 pg paper on this, and i cant even begin
Stpehen Crane used interesting literary techniques such as colorful metaphors which can easily be identified in eg like knowing eyes which represent the people of Dunnet (ammons, 84). Another literary technique he uses often is irony which is seen in chapter with Mrs. Todds variety of personality which shows how Mrs. Todd has this varied personality(eden, 141). Other literary techniques shown are comparisons and contradictions, dramatic personification and powerful paradox.
Q: HOw to classify tower crane?
From okorder / are divided into upper rotary tower crane and lower tower crane two broad categories.In which the carrying capacity of the former is high than the latter, in many Construction sites the tower cranes we have seen are On a rotary festival add up on the top of a high tower crane access. According to whether the move can move,tower crane are divided into: walking a line, and fixed ones. The fixed tower crane do not switch, installed in the block of concrete baseBasis, or installed in the form of X-shaped concrete foundation. In the housing construction generally use a fixed style.
Q: What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
It is MTC 78000 in offshore industry.It can able to lift nearly 2000 tonnes and is one of the world's biggest slewing cranes.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords