• Tower Crane TC6016 Construction Equipment Building Machinery System 1
  • Tower Crane TC6016 Construction Equipment Building Machinery System 2
  • Tower Crane TC6016 Construction Equipment Building Machinery System 3
  • Tower Crane TC6016 Construction Equipment Building Machinery System 4
Tower Crane TC6016 Construction Equipment Building Machinery

Tower Crane TC6016 Construction Equipment Building Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6016 Construction Equipment Building Machinery


\Tower Crane TC6016 Construction Equipment Building Machinery\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6016 Construction Equipment Building Machinery

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: Why do tower cranes need to be fabricated?
The crane wire rope commonly used varieties of phosphating coating steel wire rope, galvanized steel wire, stainless steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope double - phosphating coating.Phosphating coating of steel wire rope production technology patent, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire for rope wear resistance and corrosion resistance is greatly improved, the use of direct phosphating steel wire twisting steel wire rope.
Q: I am currently an electrical apprentice but would like to become a crane operator. Something i have always wanted to become. I was wondering what the job market is for a tower crane operator vs a mobile crane operator? Also what is the salary comparison? Also how to get my foot into the door and become one. Thank you!
You have to be able to do simple trig to figure what your crane is capable of. You will have to become a member of the crane workers union. Someone may have to die to make a space for you. You may have to take jobs that are just fork lift qualified, if you are lucky, you might find work at seaports unloading cargo ships.You may have to work your way up through the ranks as a wrecking ball operator. The very lucky will make 50-60K +. The really good ones will make more only after many years.
Q: ok I found an injured crane what do I feed it?
Cranes are omnivores. But I would feed crane with vegetarian stuff like grain, berries, plants, roots, seeds, stems, bulbs, fruits, nuts. But if you want make it non vegetarian then rodents, fish, amphibians, snakes, rodents, lizards, small fish, frogs, shellfish, mollusks and crustaceans.
Q: this wind speed refers to that height of wind speed?
Surface wind speed is greater than 6
Q: She was editing some of his writings. She was appalled(prim proper Nebraska gal) by his lack of punctuation. He said he didn't have the time for it. He was right. Shortly after he died of TB. Do you ever feel that time is your enemy; that you have only so many years to make a difference?
Wow. What a well-read intelligent question. I had forgotten that I had ever heard of Willa Cather. I really wish I did feel, or had ever felt, that I only have so many years to make a difference. Maybe I wouldn't waste my time so much. I think I feel now that it's too late to start. #sigh#
Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
The cranes are self erecting. The cranes tower is raised in sections. The lowest section is jacked up to the correct height and then a new section inserted and so on.
Q: What is the maximum weight an industrial crane can lift?
Last okorder /
Q: Hi, lately I found out how to make origami cranes. I heard somewhere that there's a charity that you can send in origami cranes and they'll help Japan. Can anyone give me this charity? Or any way to help Japan with origami cranes! Thanks!
I raised nearly ?70 for Japan by folding paper cranes and selling them for 50p each. Be prepared for sore fingers! It's worth it though :)
Q: I'm trying to workout the best height of a truss for a ship-to-shore container crane project. The crane will have a 65m outreach, 18m center section and 15m backreach. I was thinking in the region of 2m-3m truss height.Any input would be great.Thanks
Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.
Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
It depends on how big they are, and how fast you are at folding. If you can fold one crane a minute, 1000 minutes would translate to about 17 hours. How you then spread out 17 hours of paper folding is up to you.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords