Building Construction Material Tower Crane Purchase
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Building Construction Material Tower Crane Purchase
1,The tower crane is advanced in parameters,
2,reliable in performances,
3,beautiful in appearance,
4,high in quality,
5,simple in structure and easy in operation.
6,It is equipped with advanced safety devices and is easy for repair and maintenance, safe for use and reasonable in pricing, for which it has become an ideal choice for many construction enterprises.
Main Features of Building Construction Material Tower Crane Purchase
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Tower Crane Images Building Construction Material Tower Crane Purchase
Tower crane Specifiction
FAQ of Tower Crane Building Construction Material Tower Crane Purchase
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q: I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- As you won't be building your own crane (that would be stupid since you would be fully liable). Call a crane vending/renting company. They'll be more than eager to provide you with technical council. How you pick a crane? What do you need to do with it - type of crane for instance -Moving stuff around in a warehouse, yard,.. always at the same places = overhead crane -Lifting heavy stuff once (for instance another crane) or for a short period - mobile crane -lifting stuff for a longer period but not permanent (construction) = tower crane How much do you need to lift, what can it cost? ... It's al pretty simple
- Q: Okay, like a week ago I caught a daddy long legs (a crane fly) in my room with a mug and an envelope and I just left it there, when I removed it there were loads of little black dots on the envelope, I didn't really think about it cos I figured it was the coffee that was inside the mug or something. I got rid of most of them but didn't go out of the way if you know what I mean... And now there are loads of TINY little flies in my room. Could these be baby crane flies? Or something else? And if so how the hell do I get rid of them before they get huge and start reproducing all over again?!
- Crane flies reproduce in summer, but the eggs take 2-3 weeks to hatch, not to mention the time they spend as larvae, so if you caught it last week it doesn't sound like that would be the case. I would call an exterminator to get their opinion.
- Q: What is a tower crane without a collector?
- The advantage of the collector is that the tower crane can be turned on one side without any limit, and how many circles can be turned. The tower crane is basically not equipped with collector, because collector generally needs to be located at the center of the tower's turning center, so it is inconvenient for operators to go up and down.
- Q: How about the installation and disassembly of the tower cranes?
- Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
- Q: Under what circumstances does a tower crane require third party testing?
- New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
- Q: The car weights approx 900 kg.Thank you xx
- Gravity acts downwards, force = mass x acceleration. Crane acts upwards at same force. As the crane starts to lift the car there is upwards acceleration that causes more force to be generated for a moment.
- Q: Why are crane flies called mosquito eaters?
- That name and others are colloquial usage. Crane fly larvae will incidentally eat mosquito larvae if it is available to them.
- Q: What are the common problems encountered in hiring cranes for house constructions?
- Access, I assume you need a Franna. Possibly for frames and or trusses to the second level or steel beams. You will be limited by reach if the crane can only access the front of the house. In which case you may need a slew crane 30t or larger. Know the weights of what has to be lifted and the distance from the crane to where it will be placed. A crane cannot set up or travel over underground services or recently filled excavation. These things could mean the crane has to set up even further away from the house. If the crane is for unloading trucks, access again. Cranes need to stay about 3meters from power lines which is a common problem bringing gear onto site. While a slew crane generally sets up in one position for all lifts (some can travel) a Franna is designed specifically for pick and carry. It can unload trucks and travel the gear onto site under the power lines. Provided it isn't lifting extra large items. Speak with the provider about what has to be done, it will be all to familiar for any decent company. As long as access is fine and underground services won't hinder you they should know exactly what you need. Be prepared, usually a minimum 4hr hire. If you think the task is going to take longer you need to plan what has to be done and have everything ready for placement. Organization is paramount, you don't want a crane and it's crew sitting there doing nothing because you didn't plan ahead. Hope this helps, I could have been more specific if the question had some details.
- Q: What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
- The okorder /
Send your message to us
Building Construction Material Tower Crane Purchase
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords