SY-TSC Series Low Voltage Reactive Power Compensat
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Application Scope
Reactive compensation and harmonic filtering of electric power, petroleum, steel, chemical, metallurgy, wind power, semiconductor manufacturing, water supply and drainage industry.
Technical Features:
SY-TSC low-voltage SVG is designed for the load with low harmonic content but of larger reactive power demand. The device can automatically track it according to the load changing with real-time compensation to make the power factor of system stay at the best value.
SY-TSC-□/□/-660
NO. | Installed Capacity (kvar) | Fundamental Capacity (kvar) | Grading Manner (Coding) | compensation precision (kvar) | Compensator Num. (set) | Compensation Cabinet Size (L*D*H) | Compensator Capacity (kvar) | DC Drive for Reference (kW) |
1 | 500 | 400 | Coding1:2:4 | 57 | 1 | 1200*1000*2200 | 500 | 500 |
2 | 650 | 520 | Coding1:2:4 | 74 | 1 | 1200*1000*2200 | 650 | 650 |
3 | 750 | 600 | Coding1:2:4 | 86 | 2 | 1000*1000*2200 900*1000*2200 | 321+429 | 750 |
4 | 800 | 640 | Coding1:2:4 | 91 | 2 | 1000*1000*2200 1000*1000*2200 | 343+457 | 800 |
5 | 900 | 720 | Coding1:2:2:2 | 103 | 2 | 1000*1000*2200 1000*1000*2200 | 386+514 | 900 |
6 | 1000 | 800 | Coding1:2:2:2 | 114 | 2 | 1000*1000*2200 1100*1000*2200 | 429+571 | 1000 |
7 | 1100 | 880 | Coding1:2:2:2 | 126 | 2 | 1000*1000*2200 1200*1000*2200 | 471+629 | 2×650 |
8 | 1250 | 1000 | Coding1:2:4:4 | 91 | 3 | 1000*1000*2200 900*1000*2200 900*1000*2200 | 340+455+455 | 1250 |
9 | 1350 | 1080 | Coding1:2:4:4 | 98 | 3 | 1000*1000*2200 1000*1000*2200 1000*1000*2200 | 368+491+491 | 1350 |
10 | 1500 | 1200 | Coding1:2:4:4 | 109 | 3 | 1000*1000*2200 1100*1000*2200 1100*1000*2200 | 410+545+545 | 1500 |
11 | 1600 | 1280 | Coding1:2:4:4 | 116 | 3 | 1000*1000*2200 1100*1000*2200 1100*1000*2200 | 436+582+582 | 1600 |
12 | 1700 | 1360 | Coding1:2:4:4 | 124 | 3 | 1100*1000*2200 1200*1000*2200 1200*1000*2200 | 464+618+618 | 2×1000 |
SY-TSC-□/□-400型
NO. | Installed Capacity (kvar) | Fundamental Capacity (kvar) | Grading Manner (Coding) | compensation precision (kvar) | Compensator Num. (set) | Compensation Cabinet Size (L*D*H) | Compensator Capacity (kvar) | Transformer for Reference ( kVA) |
1 | 100 | 80 | Coding1:2 | 27 | 1 | 800*1000*2200 | 100 | 160 |
2 | 150 | 120 | Coding1:2 | 40 | 1 | 800*1000*2200 | 150 | 250 |
3 | 200 | 160 | Coding1:2:4 | 23 | 1 | 1000*1000*2200 | 200 | 315 |
4 | 250 | 200 | Coding1:2:4 | 29 | 1 | 1000*1000*2200 | 250 | 400 |
5 | 300 | 240 | Coding1:2:4 | 34 | 1 | 1000*1000*2200 | 300 | 500 |
6 | 350 | 280 | Coding1:2:4 | 40 | 1 | 1000*1000*2200 | 350 | 630 |
7 | 400 | 320 | Coding1:2:4 | 46 | 1 | 1200*1000*2200 | 400 | 630 |
8 | 500 | 400 | Coding1:2:4 | 57 | 1 | 1200*1000*2200 | 500 | 800 |
9 | 500 | 400 | Coding1:2:4:4 | 36 | 1 | 1200*1000*2200 | 500 | 800 |
10 | 600 | 480 | Coding1:2:4:8 | 34 | 2 | 1000*1000*2200 800*1000*2200 | 300+300 | 1000 |
11 | 700 | 560 | Coding1:2:4:8 | 40 | 2 | 1000*1000*2200 800*1000*2200 | 350+350 | 1250 |
12 | 800 | 640 | Coding1:2:4:8 | 46 | 2 | 1100*1000*2200 900*1000*2200 | 400+400 | 1250 |
13 | 900 | 720 | Coding1:2:4:8 | 51 | 2 | 1100*1000*2200 900*1000*2200 | 450+450 | 1600 |
14 | 1000 | 800 | Coding1:2:4:8 | 57 | 2 | 1200*1000*2200 1000*1000*2200 | 500+500 | 1600 |
15 | 1200 | 960 | Coding1:2:4:8:8 | 46 | 3 | 1100*1000*2200 900*1000*2200 900*1000*2200 | 400+400+400 | 2000 |
16 | 1350 | 1080 | Coding1:2:4:8:8 | 51 | 3 | 1200*1000*2200 900*1000*2200 900*1000*2200 | 450+450+450 | 2000 |
17 | 1500 | 1200 | Coding1:2:4:8:8 | 57 | 3 | 1200*1000*2200 1000*1000*2200 1000*1000*2200 | 500+500+500 | 2500 |
18 | 1600 | 1280 | Coding1:2:4:8:8:8 | 46 | 4 | 1100*1000*2200 900*1000*2200 900*1000*2200 900*1000*2200 | 400+400+400+400 | 2500 |
19 | 1800 | 1440 | Coding1:2:4:8:8:8 | 51 | 4 | 1200*1000*2200 900*1000*2200 900*1000*2200 900*1000*2200 | 450+450+450+450 | 2500 |
20 | 2000 | 1600 | Coding1:2:4:8:8:8 | 57 | 4 | 1200*1000*2200 1000*1000*2200 1000*1000*2200 1000*1000*2200 | 500+500+500+500 | 3150 |
21 | 2250 | 1800 | Coding1:2:4:8:8:8:8 | 51 | 5 | 1200*1000*2200 900*1000*2200 900*1000*2200 900*1000*2200 900*1000*2200 | 450+450+450+450+450 | 4000 |
22 | 2500 | 2000 | Coding1:2:4:8:8:8:8 | 57 | 5 | 1200*1000*2200 1000*1000*2200 1000*1000*2200 1000*1000*2200 1000*1000*2200 | 500+500+500+500+500 | 4000 |
Note: 1. The voltage grade, capacity and grading manner can be made according to customer requirements.
2. The data in the table are for reference only, we reserve the right to change the data.
3. It suggests adding a head line-in switch if the installed capacity is more than 1250kvar.
- Q: S-350-12 monitoring dedicated switching power supply 12V29A transformer connection
- may 1, you are on the wiring when the burning, it is the power is not big enough, is overloaded work. 2, you do not connect, may be connected together positive and negative, resulting in short circuit burned. Recommendation: change the new power supply, it is necessary to connect all the lines, and then the first group, to see the heat situation, to determine whether the next group.
- Q: A led lamp with a dedicated power to bring a few lights
- Know the exact power of LED lights on the best, your power is 24 * 4.2 = 100.8W, the 100.8W in addition to the light of the power per meter can, if I do not know, look at the following: One, the same circuit with LED lights, but the power and LED quality is different Why? 1, LED lights with the first launch, because the price space is relatively large, light manufacturers are using high current consistency, high brightness LED chip, this type of chip current is: 0.02A; Later, due to the price of light bulb market competition, many lights with manufacturers to use the brightness is not high, the current is not consistent with the LED chip, this type of LED chip current is: 0.011A. 2, then we use the most commonly used 5050 lamp beads, for example, first calculate the power of a lamp beads: If it is good quality LED chip: a single chip current of 0.02A, then a lamp current of 0.02A × 3 = 0.06A. If it is poor quality LED chip: a single chip current of 0.011A, then a lamp beads current 0.011A × 3 = 0.033A. 3, now we come to calculate the power of three for a group Good quality chip: 12V × 0.06A = 0.72W, 1 meter lamp with 60 lamp beads composed of 20 groups, 1 meter power 0.72W * 20 = 14.4W Poor quality of the chip: 12V × 0.033A = 0.396W, 1 meter lamp with 60 lamp beads composed of 20 groups, 1 meter power 0.396W * 20 = 7.92W
- Q: Is the industrial atomizer good with a switching power supply or a toroidal transformer?
- Need to be determined according to the use of the situation. Switching power supply and transformer power supply has its own advantages and strengths.
- Q: Do you need a separate dedicated power supply for each color dome camera?
- There are two ways to power the camera 1. Separate power supply 2. Power supply (power supply needs to match the power of the load)
- Q: Industrial plant design 10 kV substation from the power supply to the client side, such as mechanical equipment, such as the overall structure of the connection diagram
- statistics good variety of required parameters; and then to the power distribution according to user needs to choose step-down transformer, draw high and low voltage system diagram, Details of the work and then slowly do ...
- Q: The 2-way power supply is connected to a 16A 8-bit PDU in the cabinet using a 16A industrial connector
- This is a dual power input to ensure that the device will not be powered down
- Q: US Industrial Electricity Voltage
- 2. Requirements for "Scope A": 115 ~ 120V System: When lighting: 110 ~ 125V of electrical equipment; power supply point 114 ~ 126V. No lighting: electrical equipment at 108 ~ 125V; power supply point 114 ~ 126V. 460 ~ 480V system: (including 480 / 277V three-phase four-wire system) When lighting: power equipment at 440 ~ 500V; power supply points 456 ~ 504V. No lighting: electricity equipment at 432 ~ 500V; power supply points 456 ~ 504V. 13200V system: power supply point 12870 ~ 13860V.
- Q: Industrial electricity (380V) what the color of the wire, which is the line of fire, which is the zero line
- 30KW current about 60A or so, calculated by P = ui to calculate, mainly to consider the line voltage and phase voltage conversion, 380V should be replaced by phase voltage. ? 60A of the meter generally do not have to consider the installation of a more current transformer, 75 / 5A on the line, so that the secondary current in the 4 amps, the meter with 5A on the line, calculate the power when remember to multiply 15 times.
- Q: What is the industrial electricity voltage and frequency of Peru, Ecuador and Colombia?
- Ecuador's industrial voltage and frequency are: [single phase] 120V / 127V, [three phase] 208V / 220V, [frequency] 60HZ;
- Q: What brand of power control module is better? You know MINMAX and C & D two brands.
- See you want to DC or exchange. DC power personal feel that Siemens is very good.
Send your message to us
SY-TSC Series Low Voltage Reactive Power Compensat
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords