Swivel Girder Couplers/ Swivel Beam Clamps/Gravlock Clamp
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Swivel Girder Couplers/ Swivel Beam Clamps/Gravlock Clamp
Product Description
1.Item: Swivel Girder Couplers/ Swivel Beam Clamps/Gravlock Clamp
2.size:48.3mm;
3.material :Q235;
4.standard : EN74,BS1139
5.ISO 9001:2000 is approved;
6.OEM service is available.
7.type:British Type Double Coupler
Commodity name | Swivel Girder Couplers/ Swivel Beam Clamps/Gravlock Clamp |
Usage | Fixed Scaffold Pipe |
Origin | China Mainland |
Material | Q235 |
Process | Forging |
Surface | Electro-galvanized |
M.O.Q | 2000PCS |
Packing | Woven bags + steel pallet |
Delivery time | 20-25 days after order confirmation |
Payment term | T/T, L/C, Western Union |
Business type | Manufacturer and exporter |
Certifications | SGS |
Advantage | 1.High Quality 2.Professional service 3.Competitive price |
Notes | Special marks can be made according to customers requirements; |
It is available to produce by customer drawing. | |
Main products | Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding system, shoring prop, formwork system, frame system, Accessories |
Swivel Girder Couplers/ Swivel Beam Clamps/Gravlock Clamp
Company Information
We are always focusing on to supply our value produce and best service to all our customers.
- Q: New features of quick dismantling scaffolding?
- Material: the main keel is made of cold rolled steel with 2mm thickness
- Q: How to set up the temporary structure of the external structure of the balcony on the two structure
- Foundation engineering:Square - hole excavation pile - pile - reinforced concrete beam - based backfill. Pile by manual drilling, artificial trolley, concentrated heap of residual soil, automobile Sinotrans earthwork project, the allowable deviation of hole diameter of pile are as follows: 800cm, vertical aperture offset, 10cm < 1%, along the axis, vertical axis direction 7cm.
- Q: What are the full house scaffolding specification
- 5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
- Q: Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
- Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
- Q: What does Scaffolding mean in the educational talk?
- Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
- Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
- It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
- Q: Who has external scaffolding construction program
- 1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
- Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
- Q: I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
- Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Send your message to us
Swivel Girder Couplers/ Swivel Beam Clamps/Gravlock Clamp
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords