Steel Coupler Rebar Scaffolding Galvanized Scaffoldings Accessory
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube High Quality
1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q:I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
- u shud check f its swollen and if there is more painin go to the doctors
- Q:How to calculate the double wall scaffolding
- The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
- Q:Fastener type steel pipe scaffold composed of which components?
- 3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.
- Q:Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
- That is true, but it's an even worse idea to have an industrial done with rings. This is because your body can move your piercings slightly, to accommodate the angle that works best for your body. In general, that's not a bad thing, but with industrials, it's a problem. You may find that an industrial healed with rings may not accommodate a bar well; the piercing may heal unaligned, and wearing a bar could be painful or impossible. Plus any shop that thinks changing from rings to a bar at 6 to 8 weeks will make any difference from getting a bar initially, you shouldn't trust to poke needles in you. Industrials take 6 months to a year or more to heal. At 8 weeks, the piercings are still very much healing. So if you have your jewelry switched at that point, you'll be irritating the piercing, setting back healing, and you'll have to deal with all of the pressure and hypertrophic scarring problems anyway. It basically comes down to this, industrials suck to heal. Bars are hard to heal. But rings will often result in bad industrial placement and alignment. Just get pierced with a bar and deal with the problems as they come. It's still very much possible to heal an industrial, it just takes time, patience, and a really good piercer (and like I said find a better shop, whoever told you it'd work to change the jewelry from rings to a bar at 8 weeks is an idiot).
- Q:there is also shrubs and trees planted on the base of the wall and 14 feet from it
- Scaffolding and Cherry picker is your best option.
- Q:What are the requirements for the construction of the scaffolding structure?
- One of the platforms has access to the lower part of the scaffolding structure. The scaffold structure also includes a ladder that is mounted to the scaffold for the worker to pass through the opening. And the scaffold structure comprises a fixed to additional bamboo grid frame, the frame of the gate is composed of an outer bearing component and a bamboo piece composed of bearing components within the compartment is smaller than the grid spacing
- Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q:Who has external scaffolding construction program
- See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m<l = 4m4m<l = 6.5m = 12Less than or equal to 20
- Q:1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
- The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
- Q:Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
- Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Coupler Rebar Scaffolding Galvanized Scaffoldings Accessory
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords