Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Accessory Low Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube
1.Description of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: Scaffolding installation and precautions?
- When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
- Q: I want to get something pierced. My mom wont let me get anything on my face pierced but she will allow ear and body piercings. I thought about a belly ring but everyone has one amd i'm very skinny and scared it'd rip out. so i've been looking at ear piercings and really like a Targus piercing or a scaffold. But i don't know anything about them really. If you could which one is more painful, problems with them etc. please help, thank you
- If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
- Q: Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
- dont do it or wait until ur done playing football if u hit it a little bit its going to hurt an the helmet is only going to make it worse so save ur money babe
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- (3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
- Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
- . Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel
- Q: How to calculate the vertical force of scaffolding
- First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: Latch type disc scaffolding accessories is a national patent product
- Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
- Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
- 1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Send your message to us
Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Accessory Low Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords