Woven Bamboo Flooring for Floor Heating System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1200 m²
- Supply Capability:
- 30000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of product:
Woven bamboo flooring for heating
Specification:
1.carbonzied horizontal structure
2regular knots texture
3 F-type click lock
4.A grade
Features:
1. horizontal carbonized structure
2.gloss lacquer finished
3.beauty,various color for choose
4.meet E1 grade
5.pass CE/ISO9001/ISO14001 certification
6.size:1000x126x17mm or 960x96x15mm
7. harder and stronger
8. this series bamboo flooring: high-temperature and pressure carbonized desugared,degreased and dehumidification, strong hardness with high density, fine tissues with high elasticity, anti-wear & spilt-rersisting, E1 grade quality Assurance and mothproof, mildew proof, healthy & environmental.
Photos:
FAQ:
① why from okorder?
Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.
All products had been produced under a clear quality standard and the quality is consistence among the shipments.
Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.
②How to guarantee the quality of the products?
We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.
QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery,
③How long can we receive the product after purchase?
Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.
- Q: The water in the heating furnace is often good
- Bad, often change the water easy to rust. Repeatedly boiled water is low in oxygen.
- Q: I see the panel has a "cycle of digital time relay", the United States called microcomputer controller, as well as seismic pressure gauge, the rest is the switch indicator light, and there is no knowledge of what (estimated that there are two A solenoid valve a tube of water a gas), this thing on the market to sell more than 2000, I feel the cost of 200 to 300 yuan (guess, because I do not know where the burden of the child to pay the nuclear shop is too much money). Hope to tell the internal structure, which there are any components, I would like to do one, have a better picture, as well as cleaning, "time relay" set parameters (water and ventilation time), hope you greatly educated, brother Thank you The More
- Practice has proved that the method of pulse geothermal cleaning is far from the effect of good projectile, the so-called pulse is a pulse device, the name is the water to form a spiral to play out, and then rotate in the pipeline flow to the flushing pipe wall The role of the general situation are part of the water block part of the blockage is serious, the mouth can not get into the water how will rotate in the wall? I have been engaged in geothermal cleaning has five or six years, the pulse of the basic method is a hammer , The effect is very poor, and always call me this is not hot, obviously not hot, so less than a last resort I will not use the pulse, and only those who can not be demolished, or with the projectile. Since you have been demolished on a demolition in the end chanting, that thing is very simple, the cost of the burden of the child from the nuclear shop as you said it is one or two hundred dollars, only two solenoid valves, and a control of the intensity Small board, purely bluffing stuff
- Q: Rooftop electric film from the heating how?
- The heat is running up
- Q: Use the boiler is often used to adjust the minimum number of degrees
- Water temperature is 60 degrees minimum
- Q: To install the mixed water center also installed with a pressure differential bypass valve
- The role of mixed water center is mainly to adjust the warm water supply problems, to achieve automatic control of water supply temperature. Reason: According to the provisions of the country to warm the installation, the water temperature should not be higher than 60 ℃: 1, to prevent the warm water in the warm pipe, water mixers and other heating system components in the scale. 2, to warm the pipe material for the plastic material, the higher the temperature of the working environment, the greater the pressure, will shorten the warm life. Municipal central heating more in accordance with the heating film heating temperature of 80 ℃ to the water, far more than the warm to apply the highest temperature. The mixed water center can mix the low temperature water of the heating system backwater into the water supply pipe, lower the heating water temperature, and then supply it to the floor. Refer to the following figure: Madison fireplace, dedicated to your service.
- Q: We have two or three years useless to warm, the annual temperature is about 23 degrees. This year is still not hunger view spy grab the silicon oblique helmion want to, do not know the ground heating facilities have no harm, need to pay attention to what? Question added: water to warm, thank you! More
- First of all do not know what type of floor you are using to warm, plumbing or warm, if it is plumbing, then you need to check your pipe, water separator, boiler have to do it again because of prolonged stagnation, boiler components And the valve carbon because of the accumulation of dust is too easy to produce gas holes blocked the problem, for a long time to use the need for professional after-sales staff to carry out cleaning work. Plumbing water separator is also one of the key components, if you stop before the use of the pipeline is not completely ruled out the circulating water, then the water calcium, chlorine and other molecules will be attached to the metal surface, for components and pipes are back Produce corrosion. It is recommended that you do a detailed check before reusing it. As for the warm pipeline recommended to suppress the test and clean up. If you use the electric floor to warm, the problem of water to meet the heat will not occur, but can be carried out one by one room to open the test. Open for about an hour or so, you can detect the normal heating system or not. The wall thermostat can be tested by adjusting the temperature function. There is no complete harm. If you are a northern city, then it is important to note that the effect of low temperature on the circulating water in the tube. If you do not need to open every year then it is recommended to do a year to open the test and water action.
- Q: My house can not live in the winter Zhangjiakou mouth in the north will not be frozen? I installed the warmth. More
- If you do not need to carry out some maintenance in winter, maintenance methods: a. Winter should not be careful when heating, should prevent the water diversion component cracking and water pipe in the heating pipe clogging the pipeline; b. Do not be activated to prevent the water separator parts Frozen in the system after the winter is not enabled, such as indoor temperature below 5 ℃, should be, the system of water with air compressor all blown to prevent the system by freezing; winter does not enable geothermal heating system should pay attention to protection, To prevent the water separator parts from freezing or heating the water in the pipe.
- Q: Home gas boiler why the circulating pump is always non-stop turn?
- Gas boiler water pump will automatically start and stop according to the water temperature, under normal circumstances during the water pump is kept non-stop. Because the pump operation can make the system temperature uniformity, the temperature inside the furnace can reflect the system temperature. But not all brands of fireplaces are so. So the pump motor is not working properly.
- Q: Just bought a set of three chamber mocking jar ji tian panic bones bite two halls of the house, consider the home with the elderly and children intend to install to warm, do not know what kind of heating equipment to buy? I heard that Granville and Bosch are big European, to understand the people pointing ~ more
- Granville and Dr. are the name of the German brand, manufacturers in Turkey, Poland, these second-tier countries, can also call Germany? Pure German fireplace only two, a German Feiseman, a German Wo Erfu
Send your message to us
Woven Bamboo Flooring for Floor Heating System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1200 m²
- Supply Capability:
- 30000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords