Shaft Platform for Build
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Shaft Platform
As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft,
equipment shaft, stair shaft of high-rise building and so on.
Characteristics:
◆ The length of shaft beam is adjustable.
◆ Flexible structure makes lifting easier.
- Q:What is well in the construction project
- (20-30 degrees below) called the inclined well, in the civil foundation of the basic engineering, the construction of the coal mine, metal ore, non-metallic mineral industry from the ground down to the mining level of the channel called the well, vertical called the shaft, For the hard soil in the past by the artificial excavation of pouring reinforced concrete is also called wellbore, and now more use of mechanized pile foundation construction, wellbore less.
- Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
- The elevator shaft is handled according to the elevator company design, and the elevator design is needed according to the elevator. Generally before and after leaving the hole, that is, the elevator front and rear doors. I touched the elevator a lot, there are a lot of left and right are not left to die
- Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
- There is no impact, with the specific construction program, the elevator shaft design structure, the specific installation location, elevator selection, late closure noise reduction measures have a great relationship ~ ~ ~ air on the air that has no effect, where to say ah
- Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
- It was you did not find a good construction team. Because you said the treatment, it is estimated that each time are handled separately it Cost is also a separate to it Tough leaking, the need for a one-time comprehensive management Caixing. We generally as a plugging to the subsequent free warranty for 5 years. So for the construction of the terms, more than a maintenance will be much more cost. Only once repaired, in order to produce a certain profit.
- Q:Why did the Anping platform mean that the work surface could be mined?
- The backward mining can find out the change of the geological conditions and the characteristics of the coal seam within the whole mining area through the roadway, which is beneficial to the mining preparation, and the mutual interference between mining and excavation is small, and the roadway maintenance condition is good.
- Q:What are the quotas for the concrete
- (Concrete prefabricated) Prefabricated cover plate Installation of wellbore covers and associated scaffolding templates and even concrete transport, etc.
- Q:Check the wellbore height and well height respectively
- Manhole: connection (manhole) Sewage sewer and drainage pipes Maintenance workers Check through piping to prevent clogging of the structure. Precipitation and manholes are generally located at the intersection of the station's ground drains, drains, sewers or elevation changes that are prone to siltation, obstructions where it is convenient for dredging and a sedimentation draining well.
- Q:How much is the elevator floor
- First look at what you are the speed of the elevator, the elevator speed is different, the buffer distance is not the same, requiring the height of the engine room is not the same, such as 2.5m / s elevator, with 4.0m / s elevator, the buffer distance is not the same The height of the engine room is not the same.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Shaft Platform for Build
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords