Protection Platform formwork and scaffolding system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Protection Platform PP-50
A kind of new type construction protection system, applying operating platform and safer job
location for construction corps.
Characteristics:
◆ Easy and quick assembling.
◆ Lifted as a group, it is rapid and economic.
◆ Auto-climbing
◆ A safe and reliable anchor system
1. Composition
2. Assembly process of anchor system
(1) Embed V-climbing cone and anchor plate into the slab.
(2) Fix anchor shoe on the slab by tensile bolt.
(3) The fixed anchor shoe.
◆ High work efficiency with work platform and unload platform
◆ High light transmittance with the hollow block
- Q:What is well in the construction project
- (20-30 degrees below) called the inclined well, in the civil foundation of the basic engineering, the construction of the coal mine, metal ore, non-metallic mineral industry from the ground down to the mining level of the channel called the well, vertical called the shaft, For the hard soil in the past by the artificial excavation of pouring reinforced concrete is also called wellbore, and now more use of mechanized pile foundation construction, wellbore less.
- Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
- The elevator shaft is handled according to the elevator company design, and the elevator design is needed according to the elevator. Generally before and after leaving the hole, that is, the elevator front and rear doors. I touched the elevator a lot, there are a lot of left and right are not left to die
- Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
- There is no impact, with the specific construction program, the elevator shaft design structure, the specific installation location, elevator selection, late closure noise reduction measures have a great relationship ~ ~ ~ air on the air that has no effect, where to say ah
- Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
- 1, chisel in addition to paint to the structural layer. 2, the crack with a cutting machine cut into "V" word, with the expansion of rubber mosaic seal. 3, the loopholes in the use of Songshan plugging the spirit, pressure pump plug 4, with special cement paint leveling. 5, cross-painted polyurethane 4 times .6, with cement paint play a protective role.
- Q:Why did the Anping platform mean that the work surface could be mined?
- Coal seam along the direction of the mining order forward and backward. In the field within the field, to the wellbore as a benchmark, from the wellbore to the border in advance of the forward type, and vice versa called back. In the mining area, the working surface from the upper (lower) mountain to the boundary to promote the district forward, on the contrary called the district back type.
- Q:What are the quotas for the concrete
- There are three items in the quota
- Q:Check the wellbore height and well height respectively
- Manhole: connection (manhole) Sewage sewer and drainage pipes Maintenance workers Check through piping to prevent clogging of the structure. Precipitation and manholes are generally located at the intersection of the station's ground drains, drains, sewers or elevation changes that are prone to siltation, obstructions where it is convenient for dredging and a sedimentation draining well.
- Q:How much is the elevator floor
- This is based on the requirements of the elevator manufacturers, generally in the design of the time, the owners have not set the elevator manufacturers, but can have intention, according to the intention of the manufacturers of samples, the appropriate amplification, in the structure before the construction, and then modify the official information Yes.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Protection Platform formwork and scaffolding system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords