• Shaft Platform formwork system System 1
  • Shaft Platform formwork system System 2
Shaft Platform formwork system

Shaft Platform formwork system

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Shaft Platform

As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft,

equipment shaft, stair shaft of high-rise building and so on.


Characteristics:

◆ The length of shaft beam is adjustable.

◆ Flexible structure makes lifting easier.



Q: A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
In order to open the door on both sides, especially the cargo ladder. This is usually used to open the door before and after, mainly spare
Q: Check the wellbore height and well height respectively
The height of the wellbore is the height of the wellbore to the height of the wellhead. Well, is the space in the well to carry out the relevant operation. Check the chute of the well, with the same elevation of the same base, when people enter the inspection wells, to stand on both sides of the sink. So the bottom is filled with fine stone concrete, accounting for a certain height of the wellbore, the remaining wells, the net height is the height of the well
Q: Concrete is also used, grouting also note, the water does not leak are used, is infiltration
It was you did not find a good construction team. Because you said the treatment, it is estimated that each time are handled separately it Cost is also a separate to it Tough leaking, the need for a one-time comprehensive management Caixing. We generally as a plugging to the subsequent free warranty for 5 years. So for the construction of the terms, more than a maintenance will be much more cost. Only once repaired, in order to produce a certain profit.
Q: Why did the Anping platform mean that the work surface could be mined?
Coal seam along the direction of the mining order forward and backward. In the field within the field, to the wellbore as a benchmark, from the wellbore to the border in advance of the forward type, and vice versa called back. In the mining area, the working surface from the upper (lower) mountain to the boundary to promote the district forward, on the contrary called the district back type.
Q: What are the quotas for the concrete
(Concrete prefabricated) Prefabricated cover plate Installation of wellbore covers and associated scaffolding templates and even concrete transport, etc.
Q: What is well in the construction project
There is no specific definition of "wellbore" in the construction project. It is estimated that you may say that the underground pipe network and the pipeline repair well are surrounded by the cylindrical part of the tank, and the high-rise building is reserved for the elevator.
Q: My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
There is no impact, with the specific construction program, the elevator shaft design structure, the specific installation location, elevator selection, late closure noise reduction measures have a great relationship ~ ~ ~ air on the air that has no effect, where to say ah
Q: How much is the elevator floor
This is based on the requirements of the elevator manufacturers, generally in the design of the time, the owners have not set the elevator manufacturers, but can have intention, according to the intention of the manufacturers of samples, the appropriate amplification, in the structure before the construction, and then modify the official information Yes.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords